This is an FBI investigation document from the Epstein Files collection (FBI VOL00009). Text has been machine-extracted from the original PDF file. Search more documents →
FBI VOL00009
EFTA00811141
64 pages
Pages 61–64
/ 64
Page 61 / 64
Bill To: Plan D, LLC. WO #: SC521661 Invoice Number: 5517132452 Resolution: COMPLIED WITH CMP 6550 531055 Aft Cabin Below Floor FS 632 - FS 684 - Zonal Inspection Billing Method Hours Rate Total Labor USD: Flat Rate 5912.00 Total USD: 5912.00 Discrepancy: 40.63 CMP G550 531060 Baggage Compartment Below Floor FS 684 - FS 758 - Zonal Inspection Resolution: COMPLIED WITH CMP 6550 531060 Baggage Compartment Below Floor FS 684 - ES 758 - Zonal Inspection Billing Method Hours Rate Total Labor USD: Flat Rate $608.00 Total USD: $608.00 Discrepancy: 40.64 CMP 6550 531065 External Upper Fuselage FS 63 - Fs 758 View From Ground - Zonal Inspection Resolution: COMPLIED WITH CMP 6550 531065 External Upper Fuselage Fs 63 - FS 758 View From Ground - Zonal Inspection Billing Method Hours Rate Total Labor USD: Flat Rate $304.00 Total USD: $304.00 Discrepancy: 40.65 CMP 6550 531082 Electronic Equipment Rack FS 147 - FS 181 - (Enhanced) Zonal Inspection Resolution: COMPLIED WITH CMP G550 531082 Electronic Equipment Rack Fs 147 - Fs 181 - (Enhanced) Zonal Inspection Billing Method Hours Rate Total Labor USD: Flat Rate $456.00 Total USD: $456.00 Discrepancy: 40.66 CMP 6550 531085 Ext Aft Fuselage/Empennage (from Ground) - Zonal Inspection Resolution: COMPLIED WITH CMP G550 531085 Ext Aft Fuselage Empennage (from Ground) - Zonal Inspection Billing Method Hours Rate Total Labor USD: Flat Rate $304.00 Total USD: $304.00 Discrepancy: 40.67 CNIP G550 575021 Wing Rear Beam (Left Enhanced) - Zonal Inspection Resolution: COMPLIED WITH CMP 6550 575021 Wing Rear Beam (Left Enhanced) - Zonal Inspection Ref 41.2 for discrepancy found Billing Method Hours Rate Total Labor USD: Flat Rate $532.00 Total USD: $532.00 Discrepancy: 40.68 CMP G550 575022 Wing Rear Beam (Right Enhanced) - Zonal Inspection Resolution: COMPLIED WITH CMP G550 575022 Wing Rear Beam (Right Enhanced) - Zonal Inspection Billing Method Hours Rate Total Labor USD: Flat Rate $532.00 Total USD: $532.00 For detail description of the work complied with see the Work Order Detail report. Unless otherwise indicated. all financial values listed in this document are in US Dollars (USD). riAC_RevenueSquawksInvoice.rpt v3 Page 61 of 64 Printed: 3/7/2018 3:15:05PM tat W. EFTA00811201
Page 62 / 64
Bill To: Plan D, LLC. WO #: SC521661 Invoice Number: 5517132452 Discrepancy: 40.69 CMP 6550 711301 External - Powerplants, Cowl Doors, Inlet Areas, Thrust Reverser and Nose Cowls (as viewed from ground) - Zonal Inspection Resolution: COMPLIED WITH CMP 6550 711301 External - Powerplants, Cowl Doors, Inlet Areas, Thrust Reverser and Nose Cowls (as viewed from ground) - Zonal Inspection Billing Method hours Rate Total Labor USD: Flat Rate $228.00 Total USD: $228.00 Discrepancy: 40.70 CMP 6550 711302 External - Powerplants, Cowl Doors. Inlet Areas, Thrust Reverser and Nose Cowls (as viewed from ground) - Zonal Inspection Resolution: COMPLIED WITH CMP G550 711302 External - Powerplants, Cowl Doors, Inlet Areas, Thrust Reverser and Nose Cowls (as viewed from ground) - Zonal Inspection Billing Method Hours Rate Total Labor USD: Flat Rate $228.00 Total USD: $228.00 Discrepancy: 40.73 CMP 6550 994042 AD 2017-18-12 B/E Aerospace Resolution: Billing Method Hours Rate Total Labor USD: Flat Rate $152.00 Total USD: $152.00 Discrepancy: 40.74 CMP 6550 994045 AD 2017-20-08 - Gulfstrcam Aerospace - Gulfstream AFM Supplement Incorporation Resolution: Billing Method Hours Rate Total Labor USD: Flat Rate S152.00 Total USD: $152.00 Discrepancy: 40.75 CMP 6550 282641 APU Fuel Shut-off Valve - Operational Check Ref Item 40.20 Resolution: COMPLIED WITH CMP 6550 282641 APU Fuel Shut-off Valve - Operational Check Billing Method Hours Rate Total Labor USD Flat Rate $304.00 Total USD: $304.00 Item: 41 Discrepancies - Customer Requested Due List Items as of 02/15/18 Team Manager: Charles Thomas Customer Coordinator: Julian Brown Part/Modcl #: AC Serial No/Tail No.: N/A / N/A TSN/TSO: N/A CSN/CSO: N/A Aircraft Time: N/A Discrepancy: 41.1 R/II MLC Bungee upper housing is seized on lower housing. ref. item 40.52 For detail description of the work complied with see the Work Order Detail report. Unless otherwise indicated. all financial values listed in this document are in US Dollars (USD). GAC_RevenueSquawksInvoice.rpt v3 Page 62 of 64 Printed: 3/7/2018 3:15:05PM tit W. EFTA00811202
Page 63 / 64
Bill To: Plan D, LLC. WO #: SC521661 Invoice Number: 5517132452 Resolution: Removed kill MLG Bungee P/N 1159150903.1. Ordered and recieved new Rill MLG Bungee P/N 1159L57903-1. Reference Item 11.130 for installation of new Bungee. Billing Method Hours Rate Total Parts USD: Time and Material $4,371.44 Total USD: 54,371.44 Pans: Ref. No. Pan number: Description Quantity Sell price USD Extended USD 41.1 #1 11591.57903-I BUNGEE. MAIN LANDING GEAR 1 $4371.44 $4,371.44 Discrepancy: 41.2 Found broken grounding strap on L11 wing rear beam just outboard of flight spoiler while complying with rear beam inspection, ref item 40.67 Resolution: Summary: Removed discrepant bonding jumper and Installed new bonding jumper on L/11 wing out board of flight spoiler. Ref. ANIN1 27-63-11 Aug. 31/03. See steps below for full details of work accomplished and regulatory sign offs. Pans USD: Total USD: Pans: Ref. No. Part number: Description Quantity Sell price USD Extended USD 41.2 #1 NIS25083-7BB11 JUMPER, BONDING CNT 1 $41.20 $41.20 41.2 #2 NIS21042-3 NUT, SLF-LKG, 450 DEG. RDC HEX. 2 50.27 50.54 RDC HGT, RING BASE, NON-ORES Step: 41.2.1 Completed Removed broken grounding strap on 1111 wing rear beam outboard of flight spoiler board. Ref. AMM 27-63-11 Aug. 31/03 Step: 41.2.2 Completed Installed new grounding strap on Lilt sting out board of Right spoiler. Ref. ANINI Billing Method Hours Rate Total Time and Material $41.74 $41.74 27-63-11 Aug. 31/03 Item: 42 Customer Eval flight Team Manager: Customer Coordinator Charles Thomas Julian Brown Pan/N(Ode' #: AC Serial No/Tail No.: N/A / N/A TSN/TSO: N/A CSN/CSO: N/A Aircraft Time: N/A Discrepancy: 42.1 Resolution: Comply with customer eval flight. Billing Method Hours Rate Total Labor USD: Time and Material ST 22.73 ® 5146.00 $3,318.58 Labor USD: Time and Material OT 0.07 @' 5146.00 $10.22 Total USD: $3,328.80 For detail description of the work complied with see the Work Order Detail report. Unless otherwise indicated. all financial values listed in this document are in US Dollars (USD). riAC_RevenueSquawksInvoice.rpt v3 Page 63 of 64 Printed: 3/7/2018 3:15:05PM tit W. EFTA00811203
Page 64 / 64
Bill To: Plan D, LLC. Step: 42.1.1 Waiting approval (L) Step: 42.1.2 Waiting approval (L) Step: 42.1.3 Waiting approval (L) Step: 42.1.4 Waiting approval (L) Step: 42.1.5 Waiting approval (L) WO #: SC521661 Invoice Number: 5517132452 Perform Preflight Inspection. Perform Tool Clearance procedure as outlined in SOP 3.028. "Comply stab evaluation flight technical support to observe or correct interior articles fitment or operation. All in flight actions are to be coordinated and approved by the pilot in command. Record entry to be made in work order upon return." Perform Inbound Inspection as outlined in RSQCT 0056 Update aircraft hours and landing, engine hours and cycles and APU hours for the appropriate Items as applicable. Communications concerning disputed debts, including a check or other instrument tendered as full satisfaction of a debt, must be forwarded to: Gulfstream Aerospace Aun. Credit Manager PO Box 2206 MIS B-05 Savannah, GA 31402 For detail description of the work complied with see the Work Order Detail report. Unless otherwise indicated. all financial values listed in this document are in US Dollars (USD). GAC_RevenueSquawksInvoice.rpt v3 Page 64 of 64 Printed: 3/7/2018 3:15:05PM tat W. EFTA00811204
Pages 61–64
/ 64