Work Order: 
SC521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: All 
Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) 
Assoc 
Status 
Discrepancy 
Resoludon 
1 
1.1 
',WAN 
al:OrOY4 
1.2 
In 
FrotYrds 
1.2.1 
Completed 
1.2.2 
Open 
1.3 
Waiting 
approval 
a.) 
1.4 
Completed 
1.4.1 
Completed 
1.4.2 
Completed 
1.5 
Waiting 
alnroyal 
0.1 
1.6 
Completed 
1.7 
Completed 
Id 
Completed 
1.9 
Completed 
1.10 
Completed 
1.11 
Completed 
1.12 
Completed 
1.13 
Completed 
1.14 
Completed 
airfnmeGuirstreeas GSSO 
Complied with Intoundrivellminary Inspection as per RSQCT 57 rev 24 
Complied with creflight impectlon as outlined in RSQCT-113 Rev. 23 
Complied with Debrief drecklaL 
Part 91.409 f(3). No other spe0al ckaimentation requests. 
Provided tod clearer= per SOP 1028, all teals eanunted for 
Covered and PIOteCted as required 
Told serviced JAW the ground Fending and servicing handbock 14-00-00 
00mPlete WM interior Inbotrel InSPeCtianGA 3564 (CG) 5/17 and oleo 
Compiled with Sample Myra-al/lc Ru105 
Secured by customer icon arrival 
Complied with Service Team Manager Chectist 
Informalfon Cnly. 
Compiled wile SIN Quality review 0l work order and tobook entry griOr to decorate 
Tonto as required 
N/A no hatmdt to be loaded. 
For NUM purposes on,F. 
Return To Service 
IntoundfOutbaurd Impectnn 
IntOundtPrellminary IIMDECti3n 
Outbound IngoteU0n 
Preflight Inspection 
CoraPN with Petrie( Oncklat 
ArriyaVDebref 90 Day De List Review ACCCOWielle 
List Cs:orator's Airworthiness Requirements &Simnel 
Documentadon RequeStS 
Tool Clearance 
Cover & Protect 
Service Channel Toilet/0ton Galley 
AfrivaVDeParkre ASSISI & ,Ade0 Mot 
Sample RIO-attic Fluids 
Remote Valuables & Secure. 
Comply with Service Team Manager CheckIst 
Fluids Used (011s/9wdroll • (Materials OrrY) 
STM Quality review 0l work order and ke/b00k entry CriOr 
to departure 
Towing (Does not include Hangar Mores) 
1.15 
Completed Hazmat - Identey &provide a manifest, and a SritnerS 
Declaration for Darger0us GOOCIS for all bawdous materials 
that are loaded aboard any airaaR. 
FAR Fin 1210r 135 gaeratOrs x111 piovile a hazardous 
material notinatein letter reputed by FAR 135.505 (e) pax 
to mantereree at Ohs Repair Station kw FAR 145.206 (a) 
(b). 
If there b to be loading of hazardous matelots t shall be 
complied with by llama trained autheized GAC cern:noel 
only. 
1.16 
YMOn9 
alnroval 
(L) 
1.16.1 
Open 
1.17 
Completed 
Moan Donn) 
CLEMING LAMING GEAR FCC PAINT 
ConsumaNes & Shop Staples 
LIE 
Waiting 
approval 
0.1 
Major Alterations regulatory comp/ante requirements to be 
completed by instaler ea imitated on FM tam 8100-9. 
Copy and paste from attached statements as needed and 
ern as required. 
COMPLY WITH REQUIREMENTS OF FAR 25.1301 (a) (0). 
25.1353(a) and 25.1431(c) (d). 
COMFUED WITH THE REQUIREMENTS OF FAR 251301(a) 
(P). 25.1353(a) and 25.1431(0) (d), via GROJIND TEST 
REPORT-REPORT Ho. CEJO(x%g0f% REV. ), ( IN SUPPORT 
CS STC )3COCCOM ) and GR4R216.4 REPAIR STATION 
INTERFERENCE TESTING REQUIREMENTS F057 MAJOR 
ALTERATIONS COMPUANCE FORM. 
COMPLY WITH REQUIREMENTS OF FAR 25.1529, 
INSTRUCTIONS FOR CONTINUED AIRWORTHINESS 
REF X/C00( MANUAL, P/N %/OW= REV. X, FOR 
INSTRUCTIONS FOR CONTINUED AIRWORTHINESSAHD 
EILOCX 8 CC FM FORM 337, DATED )0(/XXIXXXX 
COMPLY WITH THE WIRE ROUTING REQUIREMENTS OF 
FM POLICY MM-01-04 MO FAR 25.1353 (8) 
COMPLIED WITH THE WIRE ROUTING REQUIREMENTS OF 
FM POLICY MM-01-04 AND FM 25.1353 (13) By 
ENSURING ROUTING WAS IN ACCORDANCE AC43.13-11, 
OIMGE 1 CHAPTER 11, SECTION 8. 
1.19 
1.20 
WalOn9 
approval 
(1) 
Waiting 
approval 
Update WCi
 a Seance 
faience Pant and Were & Etakree Requirements. 
II 500)' 6.21.01AM 
Gulfstream Proprietary Information 
Part I N:o 
EFTA00796563
Sivu 2 / 29
Work Order: 
5C521661 AC: 5173 STM: Chalks Thomas SCC: Julian Brown &pawls All 
Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from nylons day (or since Friday on Mondays) 
Assoc 
Stalin 
1.21 
1.22 
1.23 
(1) 
Waiting 
approval 
(L) 
Completed 
Completed 
1.29 
Completed 
1.25 
In 
Progress 
1.25.1 
Completed 
1.252 
Completed 
1.25.3 
Open 
1.25.4 
1.26 
Open 
WaiOng 
aPPrOval 
1.27 
WaiOng 
appal 
(1) 
2.1 
2.1.1 
2.2 
Completed 
Completed 
Completed 
Discrepant/ 
Reveal scope or aircraft sealer pant totehspftepars, and 
dtin reptxements reviling in paint reappliatios, and 
determine area on stir and batanCe. 
For surfaces :Akre pant is stripped and reapplied or added 
co top of existing pant on an area greater than 36 square 
feet the thickness values AO be documented before and 
after painting . If average oldness %glues remain the 
seam wore and baba reeincri b net required. 
For surfaces painted wed an area greater than 36 square 
feet and before and alter cent thickness average vanes. QC 
review for pasoble weight end ttlance revision will be 
regAred. 
• Thames wit be plottedon an aircraft droning denved 
from AMM chapter 6 a-other subtle Mach, attached to 
the week Order and meaStrensantS taken on a two equate 
foal god. 
• Reference GAMS 4000, paragraph 3.5.1 for paint 
restnclicns to fight wird surfaces and RVSM certified 
aircraft 
• Reference CAMPS 4000, total average tNduias shed not 
exceed 6 mils. 
• Per GAC Mass Properties Engineering, pant thickness of 
mis equSs .055 pounds per squre foot. 
Varear QC review, weight change is greater than 2 
pounds or .05% of IIAC, the weight and balance report 
repine rearnaitaton. 
&exert Ready for Renato Service. At reamed 
inspectsans, to in64e preflirt ropectoss, maintenance 
tasks, operational & leak checks, related doraimercaocet 
and deanna activeescompl0te. 
Contact Realm to Service group when tNs swank is 
complied with. 
Advise customer of preservation requirements per ATA 
Chapter 10 01 the releant maintenance manuals fa 
Arframe, Engines, ad MU; review requirements in 
relation to schedUal Date Po:rimed and later pctental Date 
Completed; and perform maintenarce or pesovato+ 
actions as directed by the CuStOmer and documented as a 
Work Order Squant. 
Pre-Compliance cabn refurbeshment nspecten 
NOTE: SEE APPENDIX 
04P GSSO 010010-Serree Cater Maintenance !tam 
Oleddig 
Comply with lot Codot and Hoe Cabin 
Carroty with intend Hat Cockpit LAW RSQCT-26S 0.er-I 
cow, with MOWN Hot Caton JAW RSQCT-219 Rawl 
cow, with outbound Hot Oxkplt LAW RSQCT-265 Rent 
Comply with citbeund Hot Cabin LAW fISQCT-219 Rev-2 
Remand aircraft laps and bag and scared in Seen 
9tranSOWS office. 
Sales Concesocn 
MODE DR700..7100F31 
Remove LH engne nose cowl and replace with Rots Royce 
provided exchange trat. Reference RR Newstts6h: 
tiF2013.02. 
Removed VII Eng. lamer inlet cowl PN:0K0081-019 
SMGV5P159 and installed customer repated Inlet cowl PP: 
04(0001-019514: GVSP134SV per 04P 711002 Ilan 11.1. 
Reference Rerrowi and Instdletsen Wok page IC. 
CMP GSSO 893131 Alert 5B1311703-73-A9C0383R1 - 
Replawnent d ilInCOnlomeng Part of the EEC Rebox 
Assembly 
Taber 
Only 
$1,652 
Motet 
No Charge (Rolls-Royce Warranty) (All 
Cperatas) 
The intent of this haorbiecclification Service Buletin Is to 
replace ben EEC firebox assembles that have an inefficient 
thickness of the retroescent psnt. 
Effectivity: Reference Rolls.Royce Serra Butetin 80.700-73-
x988883 fa effeCtMty 
Notes: 
Advised customer of °ogre and API) preservation requirements. 
Complied with Pre-Compliance Sin regsbishment ropecton per 14 CFR part 25. 
Complied with CMP GSSO 010010-know Center Maintenance DIMS= Cheddist 
Complied with inbound Hat Cockpit LAW RSQCT-265 Rev-I 
Complied With In0Xeld HOt Cabin JAW PSIZCf:219 Rev-2 
Summary: Removed VII Eng. loaner inlet ant PH:09C0301-019 SN:GYSPIS9 ard instated Rolls Royce provided 
exchange Wet cowl PH: 040/00/019 SN: GVSP13e5V per CW 711002. 
See steps below for detailed week prformed. 
COMPLIED WITH CMP G550880131 Nat 58 8R700-734.900383R1 Replacement of Non-Conkrmng Parts of the EEC 
Firebox ASSeMtly. 
Not Applicable due to engine SSI: effecthey 
Engine S/N: 15998 with carEguraban standard 7100111 engrawd en data plate. 
12/11,011 6:11:03AM 
Gutfstream Proprietary Information 
No: 
EFTA00796564
Sivu 3 / 29
Work Order: 
5C521661 AC: 5173 STM: Chart Thomas SCC: Julian Brown Squawks: Au 
Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) 
Assoc 
Stalsas 
2.3 
hi
3.1 
Carp kt ed 
3.1.1 
Canpleted 
3.2 
Canalised 
3.3 
Competed 
3.3.1 
Convicted 
3.3.2 
Convicted 
3.3.3 
Competed 
3.3.4 
Competed 
3.4 
Competed 
5.1 
COMMete0 
Completed 
Discrepancy 
Pans are &heckled arid procured theeurob Reff Royce. 
Reese place your crow with Ret-Rote Spares sa (6) 
months m advance and ROMP 'MO need date SO they Can 
endure parts at:0406:m. 
CameatcCem Detentes: Cuirstrern viii rrerace Rao. 
Royce CaparateCare for the three abate en the 
Custom's behalf. Determination 
wnat is of is not 
covered under the mentenzae program will be detenratO 
by RaluRcyce. My charge, net coated by the 
CorpoiateCare aceram mll be the Custemsoz rammibilty 
and %Mast to Gulfs-Cream's standard Terms and Conditons 
with regard to payment. Sutirressen dl the mote 6 
Fecicated on the CorparateCare maintenance program 
tang in (Dice at the doe a service. 
"'CANCEL"' 04P G550 880466 Alert 58 68700.73• 
A101981R3 - Irecductico of a New EEC Firebox Assembly 
nab a Revised Pant System. 
Resolution 
Cannot convey with at this time due to Darts avalabley. $6 emplane due by 31 /AN 2021 (38 rnos remairing). 
Customer Ssanatuie:  
 Date: 
ENGINE SA700-71001-11 
Rearm NI crane ncee cent and replace with Rots Rate 
Pavided enchange tot. Reference RR Newsflast 
NF2013.02. 
Removed NH Eng. Ceres inlet awl RY:060001-020 
SN:GY5P171 and Inetall&I cuRorra offered Inlet cowl PN: 
040:031420 SN: 6139 per CMP 711002 Item I I.2 
CMP G5.50 893131 Men SB BR703-73-6907383R1 - 
nepiaonnent of NanConromMts Parts of the EEC Pae%x 
Assembly 
Labor 
61,652 
MatenalS 
No Charge (RolisitOyce Warranty) (M 
Operates) 
The intent of this Non-Modification Service BuTetin is to 
replace One EEC firebox assembles that have an nuttoent 
thickness or the evanescent pert 
Effecbvity: Reference Rolls.Rome Service &ikon 80.700-73-
/ROCOCO far effectivity 
Notes: 
Parts are theckPol and procured thrown, ROI/Re/CO 
Pease place your order with Rob-Royce Spares six (6) 
months in advance arty provide yaw need date so they an 
enSure parts avaladlty. 
CapOrateCare Customers affstrearn vin invoice Rolls-
Royce Camera-Gore for the cherges above on the 
Gusts:rods behalf. Determination 
what is or is not 
covered 
or
theym
nce ortgram will be detamnol 
Si RedivRace. M dorms not covered by the 
CorpaateCare pagan nil be the Custard:es rapcnsibilty 
and Subject tO Guttman standard rerms and conoloons 
rah regard to Pareent. Subrnssien of the mode is 
pralcated on the CorporateCare maintenance pager
Ming in force at the bine of scake. 
Cannbalize Y. duct P/N 0480402-005 from NC 5173 la NC 
671, Ref: W.O. 50521837. 49.3.1 
Rowed to cannibalize 1- duct P/N 04F0402:035 sin 
/0459801. from NC 5173 for irate/label onto A/C 671 per 
RR ER710 DIM 36-1145 Rev. May 15/16 
Install prerbusly renewed cannibalized 1- duct PM 
04804024006 from NC 5173 for NC 671, itecieved dl to 
install and installed pa PREMM 36-11-45 Rev. May 15/16 
Removed tannitialeed 1: duct P/N 0480402-035, SM 
704598CR rron: NC 671 and rotated into onnianal location 
on NC 5173 RH engine per RREMM 36-1145 Rev. May 
15/16 
TWA 558135, Due- 6/18 
Leak Med( required. 
Complied with leak check of Y- Ott P/N 0486932-005 on 
R/II engine with no leas detected per G550 MM 36-11-6 
August 31/03. 
"'CANCEL"' CMP 4550 890466 Mert 58 68700.73• 
Ali/1981R3 - Irooductico of a New EEC Firebox Assembly 
with a Revised Pant System. 
APU RE220 
Tochnkal Bulletins (ASC, CB, SB, AD, ACB) 
"•CAUCEL• • 'CsIc Cs550 9/1162 ASC 1168 Nose Landing 
Gear (MS) Karnes InstalLtico 
Summary: Removed Rill Eng. boner inlet tea 68040001-020 SN:GYSP171 and installed Rolls Royce provided 
exchange Wet cowl PH: 04C0031-020 SN: G139 Der 04P 711002. 
See steps below for detailed work portent& 
COMPLIED WITH CMP e3550 890131 Net 58 BR700-736.900003R1 - Replacement of Nan-Confo-miog Pens of the EEC 
F9.103x Amend& 
Nat Applicable due to engine 5./N: effectivity 
Engine SM: 15449 ?nth ccroduratico standard 7100i-11 engraved on data plate. 
strnmann 
Removed to cannibalize 7- duct P/N 04F0402•CCG sin 045513CR, from NC 5173 for installation onto NC 671 Der RR 
Eft710 EMM 36-1145 Rev. May 15/16 Removed annbaltred1- Ott P/N 04F0402-005, SM XY4598CR Nam A/C 671 
and installed kilo aigianal location an NC 5173 FUH engine per RREMM 36-11-45 Rae. May 15/16 
/WA 558135, Due- 6/18. See Stet below. 
See Item 3.3.3 for reinstallation 
Cannot convey with at this time due to Darts avalabley. 56 a:sentence due by 31 /AN 2021 (38 rnOS remairing). 
Cogent, Signature:  
 Date: 
Customer elects ro alien at this bme. 
Customer 
Signature' 
Date: 
tdrisrzoi7 6:19:01Am 
Gulfstream Proprietary Information 
Pat I of29 
EFTA00796565
Sivu 4 / 29
Work Order: 
5C521661 AC: 5173 ST/4: Charles Thomas SCC: Julian Brown Squawks: All 
Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) 
Assoc 
Status 
6 
/Monks 
6.1 
Completed Customer request to comp/y nth Registration change to 
Ref Rein 20.1 fa no* performed 
112121E. 
Notes: Need 05< update for restrawn3 transponder etc. 
Pete Rawsen has ordered the wife Sri. 
6.2 
Watbng 
Customer request custom &midst be 'staled on DU. 
aooroval 
(l) 
Pease hold watt receipt ol Me custom ACL. 
6.3 
Completed Plight GLadarce Panel backichong does not Muir/rote for 
Sinewy: 
nicht 00s. 
Confirm NW Carved Item 
Discrepancy 
Resolution 
6.3.1 
Completed Removed night gullance panel (on: 7021852.901 sn: 
%030509) and replaced WM repaired Pr guidance panel 
(pn: 7021852401 en: 08080720) with no defects noted. NI 
work dad per GSSO CMP 221001. Ref tern 11.8 for CMP 
RIM. 
Renewed flight pub:lance panel (on: 7021852.901 sn: 06030509) and replaced wen repaired flight pub:lance Panel (on: 
7021852.901 sn: 080130720) and performed Autopla operatenal deck with no defects noted. Ahnork done ref CMP 
G550 221002 item 11.10 and GSSO CMP 22100 kern 11.8. See steps baby/ fa work performed. 
6.3.2 
Completed Performed Auteibt operational ONNk with nodefects 
noted. Al work done ref CMP G550 221002 item 11.10. 
6.4 
Completed DU 24 mop. Swapped with DU 23 and problem (phoned. 
Removed defative DU and repliced nth notified DU (p.: 7028140-905 sn: 09125363) aid performed operation:1 
deck with no defects noted. All work done Per 6550 CND 316024 and CMP 316030. Rel Items 11.7 and 11.9. 
6.5 
In 
Custard request to update ROAS settings. 
Progress 
6.5.1 
Completed Created one Settings and Riggrhas Der GER 5767 
6.6 
WAIN 
Customer requests to update the anhow 4000 aircraft 
zoomed 
photo wth the new blue paint sdierre and to add the 
(L) 
company logo. Logo to be worded by the Catania. 
Ref tern 20 1.16 
7 
Interior 
7.1 
Completed •••CANCEL•• 'Customer request to remove and replace or- Customs elects no action at this brae. 
SOW NW. YAM customer Selected 
Nees: 
Demon has samples for customer 
Customer 
Signature: 
Date: 
7.2 
WAN 
Fwd oxket door hande loose and Orals door operation. 
aooroval 
(L) 
7.3 
'Hsiang 
Lent hande for on pressure S scotching varier on as 
approval 
treSSure 000r (C8528041000) 
(L) 
Nathaniel 
8.1 
Completed "'VOID—Customer request to replace nose and man 
Otoicate Entry. REF ITEM 25.1 FOR TIRE REPLACEMENT 
des 
8.2 
Completed Replace Lil & RH Engem Cows ( to be supplied by Rots- 
Ref dens 2.1 & 3.1 foe wok performed 
Royce). 
Notes: 
Comorate Care item 
8.3 
In 
Customer request full dewing arid operatimal checks of the 
Progress 
Lavatory tank end sistan. 
8.3.1 
Completed Removed, cleaned, nspecte0, and reinstalled tftradOok 
sensors P61:7700395-001 LM SN:07.G-170]. and R/H 511:07-
G-167 per CMP 380015/383024, and CMP 38(031/380032. 
Ref. Warns. 11.44,11.45,11.46,11.98. 
8.4 
Completed Customer request to irooect all exterior sense° door latches Sunny: Installed New latch P/N 145000-2•102-142 per BP 1159851110 Rev G to the external MED switch seroce 
for seryirstality end replace one discrepant latch en the 
door. Completed inspection of di sense door Latches per G550 MM 53-00-00 )une 15/16 and found no father 
external MED snatch prvire door 
diserepanes. (See steps below for a detail of work performed) 
8.4.1 
Completed Remtreed discrepant latch On the eternal MED switch 
Senkerlar Per ED 1159651110 Rev G. 
8.4.2 
Completed Installed New latch P/N 16000-2-102-142 per OP 
1159851110 Rev G to the eternal MED swath service doer. 
Competed inspecdonol al exterior seroce door latches per 
6550 MM 530000 Acne 15/16 and 6550 MM 5240.00 
October 30/06 irking no further discrepsioes. 
8.4.3 
Completed Request paint onexternal MED switch Nate door die to 
The aircraft is getting fill Trap/paint (ref kern 13.1). The MED service {low latch wil be painted at this time. 
new latch Installation 
8.5 
Open 
Customer request to Cheek water system IndtatROS 
8.5.1 
Completed Complied with potable water tank soNix per G550 AlO4 
38-1401 March 31/17. No indication on external pond 
noted throughout entire service. 
8.6 
Completed CMP G550 275019 Flap Actuator Travel Nut (Left) - 
COMPLIED WITH CMP G550 275019 Flap Actuator Travel Not (Left) - Lubrisabco 
Lubrication 
8.7 
Completed 04P G550275020 Rio Actuator Travel Nut (Right)- 
COMPLIED WITH CMP G550275020 Flap Actuator Travel NUt (Right) • tteaca0on 
Lubrication 
8.8 
Completed •••V011)•••CMP 6550 274202 Ilarnotal Stabnzer 
Vod - Cupleate of item 23.11. 
Actuator - Lubication 
8.9 
Completed 04P 6550 491005 PAl Embus:0 FS 767 • P5 797. Zonal 
COMPLIED WITH CMP G550 491005 APIA Enclosure FS 767 FS 797: Zonal InSPeCtian 
Inspection 
8.10 
Waibng 
Customer requests 12 spare aircraft keys. 
12.15.2017 
6 :ILO AN 
Gel/stream Proprietary Information 
Nrc 4N:9 
EFTA00796566
Sivu 5 / 29
Work Order: 
SCS21661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: AD 
Yellow = Newly Added Items. Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) 
Assoc 
stews i 
approwi 
(L) 
611 
Completed 
8.12 
Completed 
8.12.1 
Completed 
8.122 
Completed 
8.12.3 
Completed 
8.12.4 
Completed 
6.12.5 
Completed 
6.12.6 
Completed 
8.13 
Waiting 
Marmot 
(1.) 
8.13.1 
Ccepleted 
8.10 
COS 
8.14.1 
Completed 
8.14.1.1 
Completed 
8.15 
Completed 
8.16 
Completed 
8.17 
COS 
8.18 
COS 
8.18.1 
Completed 
8.18.2 
Completed 
8.19 
Waiting 
approval 
(L) 
8.19.1 
Completed 
8.20 
Completed 
DIsexpanot 
addedduring debrief 
Blue 'R FUEL RETURN FAIL' CAS message appeared One 
tour min eight. Crew Aso toted dilettante oil 
temperature was 100 degrees Mous and the left al 
temeerature was 80 degrees eel:M. 
Added Oaring (letrk4 
Apu endceure has several corroded fasteners bated on 
encloare base loner access panels 
Fou4 wile COmPlying with ChIP 491085 * 8.9 
Removed APU asserrbg (Cr access to beer enclosure 
ps.eb. Ref. GSSO AMM 49e0-00 Rev. 2/15/15 
Removed FWD base rower panel 31282F and AFT base 
lower panel 312A2F. Removed COrnged hardware and 
began cleaning panels per Dossing //59851419 Rey. L. 
Finished cleanng PhD base lower pond 31282E and MT 
base lower panel 312A2F Pawing 1159851019 Rev. L. 
Installed new hardware on FWD base lower panel 31285 
and AFT base lower ps.el 312A2F per Doming /159851419 
Rev. L 
Installed AM assembly FR • WE38007001 5N • P.500 per 
6550 AMM 490060 Rev. 2/15/15. 
Thies 567921 due O%18 and 562027 due 06/18 
Leak died required on MU per 6550 AMM 494300 Feb 
15/15. 
Complied nets leak check of MO per G550 AMM 49-0043 
Feb 15/15. Received OK to dose APU panels and completed 
foal dome. 
FWD bullet faring (knee panel) ha evidence of erasion at 
fwd edge around fwd looking camera and a puncbse reside 
of fairing. Areas marked with OW grease Pence 
Ref. Item 15.1 
removed bullet farm camera for faring repair LAW 
GC515050250 Rev - 
Ape Enclosure has large area of distaded coating 
on fwd bh sde of ape endosure. 
Request engineering dmosition for APU canpartment has 
large area 01 fire retardare misprg. 
Engineern.g dsposton: 
The coatng it net repairable. Remove any loose or 
mumbling sections of coahng. If applicable remove the 
ARemate Melva oil Complence authonzaton horn the 
aircraft records. Reinstate the krnorthiness Orectiye AD 
2009-17-01 and op* MM Supplement GS50-2009-03 in 
accordance with the State Of registry reduirernerts. 
"NOID"IL/Il intgaid roriz.stab. leadre edge has tan 
rubber sat 
Rel. Paint Traveler 
" 'VOIDwIrdhl irtgard heriz.stab. Wog edge has torn 
rubber seal. 
Ref. Paint Traveler 
OIP 6550 992902 PD 2009-17-01 InsPeChan For Sealant 
Applied To The Exterior Of The Auxthiry loner Out (APU) 
ErsCIOSure 
Ref 8.14.1 erg dspo for remstabng AD 2009.17-1 
Wing body faking grew SOWN in dome nut pate at panel 
196.48 an 01 wing as marked with tape. 
REF 13.1.1 
Removed discrepant dome r
ate PN: NASMINIA3 from 
Malec PN: 1159852017-11 pa GAC DWG 1159852017 Rey 
6. 
Install% dome netPlate Par liA514703 On doubler PH: 
1159852017.41 and Entailed doubler. Bads Seale/0000er 
and nu/plate. Week clone per GAC DWG 1159852017 Rev B. 
Cytn 'AEU Mane Rennet Cm message on APU start. CMC 
fault code 4922222APU (MU ROw Ceeklet SP Short) 
Ref tens 112 
Gained access to 181A1P1 (oh APU Celina). Disconnected 
pito, inspected and cleaned cannon plug with nO defects 
noted. Returned Mat to wird confgurabon. MI 
reverters:me performed tang V/C61 4940-00 June 15/16. 
during panel 196AB nstatation noticed glen spmirg 
freely. MarkedWM tape 
ReeokidOn 
Performed heated fuel return memorial check with no defects noted. Al work done per 6550 AMM 28.16-00 dated 
August 30. 2009. 
Decade resistor box IDe 569366 cal due date 11/18 
Sunurvey: Removed and cleaned areas mond FWD base lave panel 31282F and MT base lower panel 312A2F. 
Replaced screws PN:MS27039.0609 and washers PN:M1960.108 per Drawing 1159851419 Rev.L 
See steps below tor full details. 
Removed at Rose and crumtling sections ct COOtlna per eng dep. Ref item 8.17 for PD 2009.17-01 
Ref item 8.14.1.1 for eng dope 
MRS 891 
Ref 506238.2022.1.1 
"'VOID"' Entered In wrong MC wOrkOrcler 
"'VOID"' Entered In wrong A/C wOrkOrcler 
COMPLIED WITH ChiP G550 992902 AD 2039.1741 IrciPeCtiOn Per Sealant Applied To The Exterior Cf The Auxhary 
Ironer Unt (APU) Enclosure 
previougy compiled with in Log Book Entry dated 08/18/09. 
Veiled KM Sumkment G550-2009-03 was incorportated etc the MM 
Removed and mowed discrepant dome nutdate Ph' NA51474A3 on dottier Phi: 115965201741 and installed doubler 
per GAC DWG 115%52017 Rev B. 
Installed nub:gate PH: ILASI47413 per GAC DWG 1159652017 Rev B. 
IVISROI7 6:2I:01AM 
Gal/stream Proprietary InformatIon 
Nee < of 29 
EFTA00796567
Sivu 6 / 29
Work Order: 
5C521661 AC: 5173 STM: Charks Thomas SCC: Julian Brown Squawks: All 
Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) 
Assoc 
Status I 
Diserepaney 
ReerWiliOn 
Ref kern 8.18 
821 
Compiete1 R/H elevator trim tab upper surface nas 3 areas of possible 
deaamnWon. Rd. Item 13.1 
8.21.1 
Completed Removed R/H elevator trim tab FIN: 1159C582095-423 S/N: 
373 per OW4550 273024. 
Ref. Item 11.56 
8.212 
Completed 
NOT Inspection mowed on marked SPOt 
8.213 
Completed Engineerng Cispouton for three surface discrepanoes: 
Refer to Steps 1 thna 6. 
I. Solent dean the three areas using dean cheesecloth 
weer, wet wen HoproPil Alcohol. Continue until rapers 
'then dean. Do not use synthetc or shop toted wiper 
~torah. 
2. $4 all wee locations sand ON surroundng paint using 
• 
tamde paper anti a solid paint base exist. 
3. At the two locations next to the grandrog jumpers 
carefully sand off the dry fit cloth to expose the carbon 
pir. Do not Leger art nto carton Alms. TraOSS« Claret 
remaining wein the rattle snail be acceptable. 
1. Heat areas sp to 120 to 140F for at least 20 minutes. 
After reacting this lolo time and while heat is WI berg 
apeled, surface wet areas wen Epon 828/ DTA 
(GAC I ISAA2 
GAC117G1 respectlx<v). 
S. Renacne heat source and :plow surface ta air mol to 
room temperature. Phalan at 70 to 95F trail the 
attache gels MaKII slop take dace after 4 hr,. 
6. Na other action required shoe NC mil be undergoing 
repaint. 
This is inn, repay. MR8 NO. E064 
8.21.4 
Completed Rhea cleaned tie tree discrepant areas. At all three 
locations sailed off surrounding paint. At the two batons 
reed to the mounting jumpers carefuly sanded off the dry 
821.5 
Completed 
8.22 
ritteg 
aP)rosel 
(L) 
8.23 
Completed 
8.24 
Completed 
8.24.1 
Completed 
8.242 
Completed 
8.243 
Completed 
825 
Completed 
826 
In 
Progress 
8.26.1 
Completed 
6262 
Open 
8.26.2.1 
Completed 
F/G Mtn to expose the carbon ply. Heated areas to 120 to 
140F tor at least 20 minutes Solace coated areas with 
Epan 828 / DTA (GAC11SAA2 / GAC117G1 respectively). 
Reference ergineerrg dsposstion in step 8.213 
Installed R/H elevator blm tab P/N: 115%552095423 S/N: 
373 per RIP 6550 273024. 
Ref. IS 11.561W 560348 Cal 12/2017 
Horizontal stabiles R/II hoist plug stopped. 
Ref. 13.1 
ull Flap 
Traded 1/8 Roller is worn beyond lints per 
6550 MIM 273000 Rev. march 31117 
Ref. 13.2 
MI flap 
Track Aft I/O Roller is worn beyond Imes per 
6550 AMM 27.5000 Rev. MarCh 31/17 
Ref. 13.2 
RemOved R/H Rart TraCk Mt outboard bracket Replaced 
WH Nap 
Traded 1/8 Wier with nor role, P/N 
80233012Ft per DIP GSSO 275038 and Drawing 
11591354220 Rev G 
Redved ok to Install and Instated R/H Flap Track "V AFT 
OM roller ntting. Bolts Still require torque and fang 
rewires sealant per 1159C554220 Rev G. 
Oct require torque and fang requires sealant per 
1159(554220 Rev G. 
R/H Hap track 0/8 roller bracket for track 
has shipped 
out tolts. bot roles/nutplates may require clearing out. 
Ref/ism 8.24 
While conveying wit paint strip lund dar in right fuselage 
at GYPS 694.000, skin P/N 115%51316. Impression is 
approximately C wide by r high and .012' deep. 
Rel 13.1.2 
Request NDT to Chetk for cracks at discrepant area. 
Request engineering dive for repar of dent In the right 
fuselage. 
Preliminary Engneerng Csspastten: 
I. Gain access to the Wen« Side of the dented skin 
Visually inspect the dscrepant area for any additional 
d iamaten to surroundng structure 
2. Cold work the dxrcpart area per the procedures in SR 
1077 to restore the skn to surrouncing contour 4/..005 irs 
Strnmarr. Removed CI Omar urn tab PM: 1159C552095-423 5/Il: 373. Cleaned. pepped and repaired all Wee 
surface discrepancies. Reference Engineering *%O. in SOW 8.21.3. Installed Fuls eievator ten tab Pitt 
1159352095-423 S/N: 373 Ref. DIP GSSO 273024 Items 11.56 See correspondrg steps for detals of work performed. 
1W 560349 Cal 12/2017 
NOT performed Tap test inspection on R/H elevator trim tab upper surface per GAC AIDTP 2.1 rev 7 09/16/2015 
No relevant incicabons noted at MS tele 
Replaced NI %pi? Triads Mt I/B Roller with new roller, P/N KRF233012FT, LAW CIP G550275037 and Drawing 
1159055420 Rev G 
Sirrimay: Removed Rill Flap 'V Traded outboard bracket Replaced NH Flap 11' Track AR 1/B it 
with new 
roller, FIN XRF233012FT. Installed R/H Flap 'Er Track Mt aboard bracket. Work performed per ChIP 6550 275038 
and Draning 1159C554220 Reg G. 
See steps below far detakd week performed. 
Torpred toOltS On fitting and sealed per 1159C5524220 Rev. G 
Torque Wrench* 558039 
CAL: 08/18 
Upon further imestigaton round R/H Flap Track B' 0/8 ROter Bracket hardware to be stepped and ~rates are 
functioning property_ Instated and torqued NEW hardware per 2741-05 Rev. November 15117. 
POttrmed Eddy Current Insp.:than per GAC NOW 3.0 (REV 7 SEP 2015). 
No <redo noted at the bele. 
Equprnere Used: Hartet 5005 GACD 555039 (cal due 12/17) and SID. 560706 (no cal reg.) 
Christa Kerby, MR81E742 
12/151011 6:21:03AM 
Gulfstream Proprietary Information 
port 6 of 29 
EFTA00796568
Sivu 7 / 29
Work Order: 
5C521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown squawky Ail 
Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from nylons day (or since Friday on Mondays) 
Assoc 
Stows 
102 
10.3 
11 
11.1 
WalOn0 
cfMrowd 
(1) 
Waltin) 
407001
(L) 
Waiting 
aP0rovai 
a.) 
Carpleted 
11.2 
Completed 
11.3 
Waiting 
400001
0.1 
11.4 
Waiting 
Motored 
(1) 
11.5 
Waling 
Motored 
(1) 
11.6 
Competed 
117 
11.8 
CO 0101 e t e0 
Cc n I et ed 
11.9 
Competed 
11.10 
Completed 
11.11 
Wang 
approval 
(L) 
11.12 
Wafting 
40004 
(L) 
11.13 
Waiting 
400001 
(l) 
11.14 
intiano 
Wowed 
(1) 
!Lis 
Waiting 
approval 
(1) 
11.16 
Wang 
a—
(L) 
11.17 
Waiting 
400(04 
(L) 
11.18 
Waiting 
a00Nval 
0.1 
11.19 
Waiting 
Wowed 
(1) 
12.M2017 6':2103 AM 
Dbcrepano, 
COO a Isle .1285-.133$ in. do. per GQIIIAL1)35G at the 
mare, center part of the depressen to rebore the metered 
and laelltatecolO 8oritMg. 
3 HOT the cob oorked area for cracks (eddy current) anti 
rernaring materiel tidiness (t Heinle). 
4. Inspect the cold worked wee for al caring. 
5. Reo.bmIt results to ergamerno for evaluation. 
mResE742 
Paint 
Outsesnelkm Parts, Materials, and / or Services 
enineern.3 later 
Back Ordered Parts 
Pats Return 
Follow on CMP Codes / Maintenance Tasks 
CMP 6550 711001 Inlet Coal (Left) Removal / Installation 
Ref. 2.1 
04P 6550 711002 Inlet Cowl (Right) Removal / 
Ins0lU9on 
Ref. 3.1 
CMP G550 711019 Coral Door, Engine Lower (Left) 
Rel. 'tern 2.1 
CMP G550 711020 fore Loner Carl Door (RIM) -
Removal f Instalation 
Ref. 'tern 3.1 
04P 6550 711021 Upper Cowl Door (Left) Removal/ 
Installation 
Ref. item 2.1 
CMP 6550 711022 Upper Cowl Door (Right) • RefrOYN 
Installation 
Ref. item 3.1 
OW G550 316024 DISPLAY UNIT, x4 Ref 64 
CMP G550 221001 PANEL, (LIGHT GUIDANCE(GP-500) Rd 
63 
CMP G550 316030 CENTRAL DISPLAY SYS - AM/TEST Ref 
11.7 
04P G550 221002 AUTOPILOT-OPERATIONAL TEST Rd 
11,8 
OW G550 330901 SWITCH PANEL x1 (46251) 
(VEST. SW PM) 
CMP G550 330930 SWITCH PANEL x30 (60157) 
(t/H DIVAN AFT ARM SW PNL) 
CMP GSSO 330935 SWITCH PANEL 13S (601510) 
(WH SEAT ET) 
04P G5S0 330924 SWITCH PANEL 124 (601511) 
(t/H SEAT 915V MIL) 
OW G550 330904 SWITCH EMEI. T4 (59651) 
(FWD LAY SW PNL) 
CMP G550 330925 SWITCH PAM% :25 (60153) 
(VII SEAT *3 SW PNL) 
CMP 6550 330942 SWITCH PANEL x42 (69652) 
(AFT LAY SW PNL) 
04P G550 330938 SWITCH PANEL 138 (601512) 
(RAI DIVAN LEDGE FWD 51Y PM) 
04P 6550 330936 SWITCH PANEL 136 (601511) 
(RAI DIVAN FWD ARM SW PRO 
Resokidon 
COMPLIED WITH CMP 6550 711001 Inlet anti (Left) - Remard / Installation 
TW 558064 Cal: 08/18 
COMPLIED WITH CMP 6550 711002 Inlet Or A1 (Right) - Removal f Instalation 
TW:557274 Cal Cue: 06/18 
1V(:557259 Cal Cue: 03/18 
COMPLIED WITH CMP G550 711022 Upper Cowl Door (Right) - RECAMMI Installation 
Torque Wrenches used: 557274 Cal die 06/18 
557259Cal due 03/18 
COMPLIED WITH ChIP G550 316024 DISPLAY LIMIT, et 
on off: 7028140-901 
pn on: 7028140-905 
sn oft 07092716 
sn on: 09125363 
COMPLIED win' CMP GSSO 221001 PANEL, FLIGHT GUIGVICE(GP500) 
pn Ott/00: 7021852-901 
sn off. 06030509 
sn on: 08080720 
COMPLIED WITH CMP G550 316030 CEIGRAI. DISPLAY SYS - ADJ/TEST 
COMPLIED WITH CMP 6550 221002 AUTOPILOT- OPERATICNA1 TEST 
COMPLIED WITH CMP G550 330901 SWITCH PANEL xl 
COMPLIED WITH CMP G550 330930 SWITCH PANEL x30 
COMPLIED Willi CMP 6550 330935 SWITCH PANEL 135 
COMPLIED WITH CMP 6550 330924 SWITCH PANEL 124 
COMPLIED WITH CMP G550 330904 SWITCH PANEL xs 
COMPLIED WITH CMP G550 330925 SWITCH PANEL :25 
COMPLIED WITH CMP 6550 330942 SWITCH PANEL TAT 
COMPLIED WITH CMP 6550 330938 SWITCH PANEL 138 
COMPLIED WITH CMP 6550 330936 SWITCH PANEL 136 
Gulfstream Proprietary Information 
Pays 0129 
EFTA00796569
Sivu 8 / 29
Work Order: 
SC521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: All 
Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from prevtous day (or since Friday on Mondays) 
Assoc 
Status ( 
DIsaapancy 
Raolutlon 
11.20 
Waiting 
alowerral 
CMP 6550 330905 SWITCH PANEL xS (59652) 
COMPLIED WITH CMP GSSO 330905 SWITCH PANEL #5 
0.) 
(FWD IAV SW PAL) 
11.21 
Wan) 
04P G550 330940 SWITCH PANEL 440 (57153) 
COMPLIED WITH CMP 6550 330940 SWITCH PANEL 440 
Wowed 
(L) 
(ENT CABINET SW PML) 
11.22 
KAMAN 
a00rOvy 
04P 6550 330928 SWITCH PANEL 425 (60155) 
COMPLIED WITH CMP 6550 330926 SWITCH PANEL 428 
(L) 
(UV DIVAN LEDGE FWD SW Ptti.) 
11.23 
WalOrg 
a00rovy 
CMP 6550 330927 SWITCH PANB. 427 (60154) 
COMPLIED WITH CMP 6550 330927 SWITCH PANEL 427 
(L) 
(Ull DIVAN FWD MM SW PHL) 
11.24 
Waiting 
a00rovy 
CMP GSSO 330943 SWITCH PANEL x43 (69653) 
COMPLIED WITH CMP 6550 330943 SWITCH PANEL x43 
(l) 
(AFT LAP SW PAL) 
11.25 
Waiting 
CMP G5S0 330933 SWITCH RANA. e33 (60159) 
COMPLIED WITH CMP 6550 330913 SWITCH PANEL x33 
Wowed 
(l) 
(WH SEAT x 1 SW PAL) 
11.26 
WalOn9 
04P 6550 330939 SWITCH PANEL 439 (601514) 
COMPLIED WITH CMP G550 330939 SWITCH PANEL 439 
Wowed 
(L) 
(Rill DIVAN AFT MM SW PHL) 
1117 
IMAM 
a00rOvy 
04P G550 330941 SWITCH PANEL 441 (50251) 
COMPLIED WITH CMP G550 330941 SWITCH PANEL T4I 
(L) 
(CREDENZA SW Pta.) 
11.28 
WalOrg 
a00rOvy 
04P G550 330929 SWITCH PANEL x29 (60156) 
COMPLIED WITH CMP G550 330929 SWITCH PANEL 429 
(L) 
(UV DIVAN LEDGE AFT SW PtiL) 
11.29 
Wilting 
a00rOvy 
CMP G5S0 330932 SWITCH PANEL x32 (57152) 
COMPLIED WITH CMP 6550 330932 SWITCH PANEL x32 
0.) 
(LM WINDOW x 7 SW PM.) 
11.30 
Waiting 
04P G550 330937 SWITCH PANE. x37 (601513) 
COMPLIED WITH CMP 6550 330937 SWITCH PANEL x37 
Wowed 
(l) 
(R(H DIVAN LEDGE AT SW PNL) 
11.31 
%Y910ng 
04P G550 330903 SWITCH PANEL X3 (57352) 
COMPLIED WITH CMP G550 3309W SWITCH PANEL 43 
Wowed 
(1) 
(GALLEY SW PtiL) 
11.32 
waltin9 
a00rovy 
04P G550 330934 SWITCH PANEL 434 (57151) 
COMPLIED WITH CMP G550 330934 SWITCH PANEL 434 
(L) 
(Rill SEAT *2 SW PttL) 
11.33 
Waiting 
a00,0 94 
CMP G5S0 330902 SWITCH RAND. e2 (57351) 
COMPLIED WITH CMP GSSO 330902 SWITCH PANEL #2 
(L) 
(GALLEY SW PttL) 
11.34 
Waiting 
agliOral 
CMP G5S0 330931 SWITCH RANO. e31 (60158) 
COMPLIED WITH CMP 6550 330931 SWITCH PANEL x31 
(I.) 
(VH WINDOW • 6 SW PM.) 
11.35 
Waiting 
04P GSSO 330926 SWITCH PANEL x26 (60152) 
COMPLIED WITH CMP 6550 330926 SWITCH PANEL x26 
Wowed 
(l) 
(IA SEAT x 2 SW PNL) 
11.36 
WalOn9 
04P 6550 233084 Dgtal Video Dsc Player (No. 1) • Anal 
COMPLIED WITH CMP G550 233084 Digital Wee Disc Player (Na. I). Final Phase Removal InRyla0on 
Wowed 
(L) 
Phase Removal / Installation 
11.37 
%Yang 
aPorgral 
CMP 6550 233089 Dgtal Video Du Play. (No. 2). Final 
Mese Removal/ Installation 
COMPLIED WITH CMP G550 233069 Dgrtal Video D8O Play. (Na. 2). Final Phase Removal InstarlaBon 
(L) 
11.36 
Waiting 
a00rOvy 
CMP G550 233061 Canoed Dec Player (1b. 1)- Anal 
Mose Removal/ Installation 
COMPLIED WIT' CMP 6550 233061 Canpact Disc Player (No. 1) - And Phase Removal! ireddlaticn 
(L) 
11.39 
Waiting 
aegrOral 
CMP 6550 383001 TOILET, AFT LAY 
0.) 
11.90 
Ccmpleted 
CMP 6550 323011 Lending Gear Emergency Extemion 
COMPLIED WIT' CMP 6550 323011 Landirg Gear Emergency Extension Netogen Bemedawn Borne (Right) - 
Nitrogen Bkromieren Bottle (Art) - Amoral! Irate/Ian:0 
Removal/ Instalatem 
1W: 568539 Cal. Due: 02/18 
IW: 562027 Cal. Due: 06/18 
11.41 
Completed 
CMP G550 351023 Crew Ongen Mask and Regulator Box 
COMPLIED WITH CMP G550 351023 Crew Ceygen Mask and Regulator Box (COsetver) Removal! Instigation 
(anerver) Removal! Irntalation 
Ref. 23.22 
11.42 
Completed 
CMP 6550 351036 Observer Oxman Mask Removal! 
COMPLIED WITH CMP G550 351036 Ctisemer Oxygen Mask Removal F Installagan 
Installation 
Rel. 2122 
Mkt page: I2C 
11.93 
Waiting 
CIO 6550 381001 WATER TANK, el 
Motored 
(l) 
Ref. 15.1 
11.44 
fY910ng 
CMP 6550 380015 Waste Tank UltrasonIC Level Sensor 
COMPLIED WITH CMP G550 380015 Waste Tank Ultrasonic Level Sensor (Let) Removal 1 Ingailathri 
Wormed 
(L) 
(Left) - Removal / Instalteko 
IW: 567921 Cal Due: 09/18 
11.45 
Completed 
CMP G550 303031 Waste Tank Leta Level Sensor left. 
COMPLIED WITH CMP G550 380031 Waste Tank Ube Level Sensor left., Deanna 
I2'lS2017 6.2i.taAm 
Gulfstreem Proprietary Information 
Pad sof 29 
EFTA00796570
Sivu 9 / 29
Work Order: 
SC521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: All 
Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) 
Assoc 
Status 
Disawanet 
Resolution 
Ocianrg 
TW:567921 Cal Cue:09/18 
11.46 
ComMeted 04P 6550 380032 Waste Tank Ultra Level Sensor Right, 
COMPLIED WITH CMP 6550 380032 Waste Tank Ultra Level Sensor Right Oearing 
11.47 
Waibng 
003nlig 
CIO GSSO 393025 Logs Gritrol MOtb.ne System-bps Ck 
TW:567921 Cal Due:09/18 
(I.) 
al
0 
11.48 
Waiting 
al
CIO 6550 383024 Waste Tank Ultrasonic Level Sena 
(RV% Removal / Insolation 
COMPLIED mni OW 6550 383024 Waste Tank Ukrasonic Level Sensor (Right) -Removal/ Installation 
0.) 
1W: 567921 Cal Due: 09/18 
11.49 
Completed CMP 6550 283006 FUEL SYS-Aux POWER UNIT BLEED 
COMPLIED WITH OW 6550 280006 FUEL SYDAUX POWER UNIT BLEED 
Ref tern 8.12 
11.50 
Comokted 04P 6550 4%001 Audign Power Unit (AIM Ftwaonal 
COMPLIED WITH CMP G550 490001 AlWilify Power Unit (ARV) • Funanal TeSt 
Test 
Ref tern 8.12 
Ref. squznkk 8.19 
11.51 
Walen9 
approval 
04P 6550 342650 Reward tcolong InfraredWin:10w 
Assembly - Removal / Installation 
(L) 
11.52 
Walen0 
CMP 6550 352009 PAX OXY SYS (AUTOIMMI)-FUNC CX 
%NOW 
0.) 
11.53 
Comokted 04P 6550 491101 OM • Removal 2 InstalaUon 
COMPLIED WITH CMP G550 491101 AP IS • Renxival / Installation 
Ref tern 8.12 
11.54 
Waiting 
CMP 6550 275001 Ftnp Swami* (Left) - Renewal f 
OW 
(I.
.)
Installation Ref.13.1 1 
11.55 
Waiting 
onward,
(L) 
CMP 6550 275002 Flap Swami* (Rght)- Removal! 
Installation RE113.1.1 
11.56 
Comokted CMP 6550 273024 Trim Tab, Elevator (Right) Rel. Item 8.21 COMPLIED WITH CMP 6550 273024 Trim Talx Elevator (R301) 
1W 560348 Cal 12/2017 
11.57 
Completed 04P 6550 273306 EVL TRIM TAB CONTROL SYS • F/T 
COMPLIED WITH CMP 6550 2733% EVL TRIM TAB CONTROL SYS - Fp 
11.58 
WAN 
approval 
04P 6550 324003 Main Wheel Assembly (Left Outlwald) • 
Removal f Instalation ref 25.1 
(1) 
11.59 
WAN 
approval 
04P 6550 324004 Main Wheel Assembly (Left Irtgard) • 
Removal f Instalation ref 25.1 
(1) 
11.60 
Wall1n9 
04P 6550 324005 Main Wheel Assembly (Right Inboard) • 
11.61 
NOW, 
(L) 
Waiting 
ReM041 t Insta? Aim 
CMP 6550 324006 Man Wheel Assembly (Right Outboard) -
%NOW,
0.) 
Removal t Instafatban ref 25.1 
11.62 
Waiting 
CMP GSSO 324009 Msn Landing Gear Wheel Iliearrg (Left 
Wowed 
(L) 
Outboard) - Inspection / Ow& ref 25.1 
11.63 
Wall1n9 
04P 6550 324010 main Lancing Gear Wiled Beath) (Left 
Worm's,
(L) 
Inboard) - Inspection !Check ref 25.1 
11.64 
Wall1n9 
CMP 6550 324011 Main Landing Gear Wheel Bearing (light 
Wowed 
(L) 
Inboard). Inspection /Check ref 25.1 
11.65 
Walen9 
04P 6550 324012 Main Landing Gear Wheel Bearing (Right 
11.66 
(1) 
Waiting 
aPINOYal 
Outtgard). InWettian / Oka* 
ref 25.1 
OW GSSO 324015 Msn ire Assently (Left Outboard) - 
InWeCtian ref 251 
0.) 
11.67 
Waiting 
CMP 6550 324016 Mein lire Assembly (Right Outboard) -
'onward,
0.) 
Inspection ref 25.1 
11.68 
Wall1n9 
04P 6550 324034 main lire Assembly (Right Inboard) • 
'onward,
(1) 
Inspection ref 25.1 
11.69 
Walen0 
onward,
(L) 
04P 6550 324033 Main lire Assembly (Left Irtgard) • 
Inspection ref 25.1 
11.70 
Walen0 
CMP G550 324020 WHEEL. L MG OBD(s1)-NDT IN5P ref 
11.71 
(L
)al
(L) 
Waiting 
aPINOYal 
25.1 
CMP 6550 394021 lIMEEL, L MG Itt8D(E2)-NOT INSP 
ref 25.1 
0.) 
11.72 
Waiting 
'onward,
CMP GSSO 394022 lIMEEL, R MG ItifiD(e3)4407 INSP 
ref 25.1 
1.11:‘,2017 6:21:01AM 
Gulfstream Proprietary Infermatlen 
Paw 0 of 19 
EFTA00796571
Sivu 10 / 29
Work Order: 
SC521661 AC: 5173 STM: Charts Thomas SCC: Julian Brown Squawks: MI 
Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) 
Assoc 
Status 
Discrepancy 
RawAudon 
(L) 
11.73 
Wean? 
aPPrOWI 
CMP 6550 324023 WHEEL, R MG O00(M)-NDT INSP 
rel 25.1 
11.71 
%Wen; 
aeprovd 
CMP 6559 123301 Min The Assembly - Senicng 
rá25.1 
(L) 
11.75 
COmPkted CMP 6550 314030 Modular AmOnKS Unit s1 - Remaal! 
COMPLIED WITH CMP 6550 314030 Module. nocrucs Unit II • Removal / Instalation 
Installation 
Torque Wreed, C/N: 553002 Due: My 2018 
11.76 
Competed 0.1P 6550 314030 MCdular Amoncs Unit r2 - Removal? 
COMPLIED WITH CMP G550 314034 Mockler Avows Unit 42 • Removal! Inealation 
Installation 
Torque Word C/N: 553002 Due July 2018 
11.77 
Wailing 
a00ronal 
CMP 6550 314120 ASC8 Tenn Sweep 
COMPLIED WITH 09P G550 314120 A503 Take. Sneep 
11.78 
Cu 
Waiting 
a00nOW1
CMP GSSO 314025 CENTRal /89515OP 01E0( 
(L) 
11.79 
Waiting 
approwl 
CMP G550 344207 Enhanced Ground Pm:dinky ~hear 
Warning System - Rerun to Service Test 
COMPLIED WITTI CMP GS50 399207 Erhanced Greed Proximity Weideled Warrig Sporn - Relent to Service Test 
(L) 
11.80 
Wailing 
approwl 
CMP 6550 344201 MODULE a1, EGPW5 
COMPLIED~ 09P 6550 344201 MDCULE s1, EGPWS 
(L) 
11.61 
Wailing 
approval 
CMP 6550 345810 GPS • OpteatKnal Chedi 
COMPLIED~ 09P G550 345'310 GPS • Operational Cheek 
0.1 
11.82 
Carpeted CMP 6550 314309 inadular AmOnKS Unit 43 - Remaal! 
COMPLIED WITH 09P G550 319309 Module. avioncs Unit 43 Renwal! Ingalatgn 
Installation 
Torque WrenchC/N: 553002 Due July 2018 
11.83 
Wien? 
aPPrOYal 
CMP GSSO 314320 MAU Operational Ole& 
COMPLIED WITH CMP GS50 319320 mau Operational Ole& 
(L) 
11.81 
Waibro 
approval 
CMP 6550 275037 IS Track flap Raters (Left Inbed Upper 
Aft) - Renwal! Installation 
COMPLIED WITH 09P 6550 275037 B Trod, Flap Rollers (Left Inboard Upper Mt) - Removal / Instalbbon 
(L) 
Rel 8.23 
TW: 558064 a due: OB/18 
11.85 
Wean; 
approval 
CMp GSSO 275038 IS Trod flap Raters (Right Inboard 
Upper AA). Removal! Iretdlabcri 
COMPLIED WITH CMP GS50 275038 B Trod, Flap Rollers (bold Inboard Upper AR) - Rernmal / Installation 
0.) 
Ref 8.24 
TW: 558064 a due: OB/18 
11.86 
Completed •••PERMMANT REMOVAL*** 04P G550232150 Cabin 
naPERMENANT REMOVAL" n COMPLIED WITH Gla GSSO 232150 Cabin Nelwak Accderdor. REF: SOR INSTALL 
Network AcoderatOr 
15.15 
Plat. 
5/N: 669 
FS: 632.000 
WT: 10.12 LB5 
12 
Wat's - Work Orange Requests 
12.1 
~Ong 
aPPrOYal 
WCR 1- APPROVED: Custc.ner request the Entrance Doer. 
Arstali Door Jamb, Insole tanong Gear Daiii'S and Inskle 
Cl.) 
Surfaces of me ha Crakes oe panted "mite as existed color. 
This WCR is witten to commulate chance horn proposal 
7037536, and customer drecoon 
Information Only Item 
12.2 
Ward 
«Prol 
WCR 2- EXCUSED: Customer request to replace al Cam 
closet Inn; material we. OJSIOMet selected grossOnt. 
22.3 
(L) 
Open 
WCR 3- APPROVED: Customer request to renvox the two 
12.3.1 
Open 
(2) console tables and Ws Irom me wan sae ledges. 
Wood Later Only 
12.3.2 
Open 
INT Stpport (PAR) Labor OW 
12.3.3 
Open 
Inspeedon tabor Qty 
1ZA 
Ogen 
VCR 4- APPROVED: Customer request to remove al cabin 
dual cuprielders and replace with single cwh016N, No 
cuplidders wal be required at the diven or the area 'Mere 
the two cols* tees are rerncned. 
12.4.1 
Open 
INT Shea meal Labor Only 
12.9.2 
Open 
Wood Labor Only 
12.9.3 
Open 
Inspection labor 0* 
12.5 
ViDiOng 
arofovai 
WCR S. DECUNED: Customer request to replace the 
allStak vinyl with new customer seeded 
12.6 
(L) 
Open 
WCR 6- APPROVED: Customer request to replace the galley 
and galley annex counter top nouns mtt. narcinood. 
The current nosngs vilt be removed. The new noungs wil 
be fabricated of hardnood and veneer. 
12/11,2o17 6:2I.03AM 
Gulfstream Proprietary Information 
Pen IO of 29 
EFTA00796572
Sivu 11 / 29
Work Order: 
5C521661 AC: 5173 STA: Charles Thomas SCC: Julian Brown &pawl= MI 
Yellow = Newly Added 163,174 Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) 
Ain 
Stalin I 
WiCreglancy 
Resolution 
12.6.1 
Open 
Wood Labor Only 
12.6-2 
Open 
INT Finish sal Paint Leber Onty 
12.6.3 
Open 
Inspection Labor Ortv 
12.7 
Waiting 
approval 
(L) 
WCR 7. DC-CUNED: Customer requests t0 add MO (2) each 
110 VAC and two (2) each USE <hissing ports in the 
codpt 
12.8 
Waiting 
awroval 
ViCR 8. CeCURED: Customer leaves% instaltgron of LED 
Wester lights. 
12.9 
(L) 
Waiting 
approval 
note: Mrstar light bezel plating Is not Included. Sbautl the 
light bezels realm plating. the Rem wll be worked as a 
line and material effort 
ova 9- DECLINED: Customer requests to replete allcalm 
hardware. 
12.10 
(1) 
Waiting 
aPPriwal 
Due to fluctuations in plating costs, cis WCR a berg 
presaged as a bidgetary effort. 
Al cann hardware wit be removed anti plate(' to the 
customer selected finish. the plated terra wit be 
reinstalled and operatenaty inspected for proper fit and 
funCtiOn. 
Notes: My repairs found nerwvwxy ere not included end 
wet be addressed on a brie and inaterul basis. 
VCR 10- CeCUNIEO: Customer request t0 recover the 
baggage compartment with new grosspoinl matted. 
12.11 
(1) 
WaiOn9 
aPProval 
Tee baggage compartment will be disassembled as required 
t0 remove al misting grosspoint from the subsoate and 
omen. Specified grossoont will be notated on panels and 
all areas of baggage gm:sport. 
Al applKable hardware and hardwood Ifni val be repainted 
to match the new macro,. 
PrepOSal based on reuse a all applicable gOstrate and 
componentry n exhort° COndtlOn. 
Repairs to substrate pats are not ncluded and wzl be 
quoted on a tine and material bags. 
VCR 11. CC-CLINEO: Customer reqUints to replace the 
curse-it chna and flatware trawer inserts with new. 
(L) 
13 
Option 1• Full Pant • (Ref. Item D 1.1 of Prommel 
13.1 
Open 
ID* 7037336, ROD) 
°Mien 1. NI Pant 
The preparation and applcation of the exterior pant wll De 
apole0 n accordarxe with the orocethres are 
specifications waned is the Gulistream Aerospace Material 
and Process Specification (GAMPS 4000) and will 
Include tee Wiener.) Customer 'peened elements: 
13.1.1 
In 
The enSh09 Paint roll Pre removed from the Swart. 
Compoote surfaces wil be self sanded to 'ww.e the 
Voss from the excang paint. 
The main entrance Antall- door. Altair doorjamb, and 
baggage &or Arne wit De parted to mach the Primary 
fuselage Woe. 
The nude of the landing gear doers rill be painted with 
the same base color as the outstie surface. 
The Landing gear wet Pre deaned. 
Ynng wales wll be applied n madame with approved 
A new radon DOOt wll De acoleci. 
An antenna leadna edges wll have erosion tape applied. 
Preciously polished metal wrier: wil be buffed. 
The aside surfaces of the aimrakes wet be painted. 
After completion of the erter cir paint, a weight and balance 
wll be performed on the eboeft. 
Any terns not listed above wil be quoted map:retain 
basis by the GlifStrtem locates Para Operatlens 
manager, inducing labor and materials on a Won Ovnge 
Realest (MR). 
"' SEE APPENDIX FOR ADDITICOM IAPO •" 
MechaNcai Pare Traveler 
13.1.1.1 
Progress 
Completed Temperately install of panel 32SAT, and panel 337CT fee 
part traveler Pet 6550 ANN 55.30.00 Rer.ftw 15/17. 
13.1.1.2 
Open 
Rel.13.1.1 
Remove panel 32SAT, and panel 337CT after completion of 
pant traveler per GSSO Anal SS-30-00 Rev.Nov 15/17. 
Rel.17.1 
13.1.2 
Waiting 
2rea Aircraft 
Sopped aircraft per GAPS -0300 rev. G. 
13.13 
Imp 
In 
PrepPM:rart 
Pre9reSS 
I2.05,20I7 6,2113AM 
Gulfstream Proprietary Information 
Past I I of 19 
EFTA00796573
Sivu 12 / 29
Work Order: 
SC521661 AC: 5173 STM: CharIM Thomas SCC: Julian Brown Squawks: M 
Yelblv = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) 
ASSOC i
Stalt181 I 
Disamsancy
13.1.1 
Open 
13.15 
Open 
13.1.6 
Open 
13.1.7 
Open 
13.18 
Open 
13.1.9 
In 
Progress 
13.2 
Completed 
13.3 
Open 
13.3.1 
Open 
13.3.1.1 
Completed 
S 
Waibng 
approval 
(1) 
In 
Progress 
Layout ArcreA 
Part Aircraft 
DetallNrcraft 
Weight and Waite 
customer support 
ergneenng supped 
Inspect di flap rollers prior to pent. 
Radome to Snare perimeter steps. detail Insprxtion R/H 
Se negative step of .053 out of links, malted with 
rmskng tape with mows per G550 AMM 53-02-01 Rev. Nay 
15417. Ref Plant bavekx 1 le. 
Request engineering Oimosnon to cared rt/H Sate negative 
step on radorne that is out of limits. 
Engreeerng Dspezton: 
It IS acceptacie to repar the outol.toluance radcrne sten 
In accordance with Gurstream %nice Letter GSL035300301 
Rey. .*Aerodinarnic filer Sweep- Fair Procedure - 
Radcme Steps". This Gullstrearn Seneca It 
(a) a 
Ct3S9Aed as a Man& acturers Service Document and IS 
gleeMed by ArIMPXy Circulars 20.176A and AC 120.77. 
Completing a repair per a Gullstream Serwce Letter is 
Slmfar to tOrnMeting a repair per the Sincere Meer 
Manual (SRM); No sepal number SPEC.% FM Form 8103-9 
is required and vell not be mended n support of a GSL 
repair. The Engneenng (Scarce) Data for this Service 
Letter has been shown to comply AIM the soot* FM'S 
artIls FM Approved. &sinew.° source data is retained 
by Gulfstrearn as propietary data. 
Photographic Documentation • (Rat. Rem Ei 2.1 Of 
Proposal IDS 7037536, ROO) 
Priptourare- Whimcreation a no dupe to Customer may 
be taken n act:rant nth the folbmng agreement 
between the Custoter and Gullsveam. 
Should the Customer like to ParVegate in this PhotograpNc 
Documentation, please renew the folkmirg agreement 
and authorize by accepting this item on the proposal 
summary Page 
Agreement: 
airstream reserves the right to photographicallydocument 
the outetting process and the refurbshe0 arcraft. Al
Photographic DOCuMentifign Is accompli9ed at 
Gfistresen% dsueton. 
GI-Ostrom reserves the right to use in advertising, as the 
OA fah./ Internet sites GullereamsAde0S. promoting or 
othenstse supporta° the business of Cunneen\ Inciudre 
wakes imeaoca copYng, ram:duct/a% ph1shing in a 
Before and After coffee table beck, n hole or in pal. 
Indvdually a In conjunction AIM other matcrials. 
The aircraft and oanosimp information ...al Mt be included 
in any pubic Nblicabch 
Buyer is prended with the falowng photography after 
aircraft delivery: 
One (I) electronic copy et areran FeCteg-arwe 
3st Oxman (Ka-hand) Nigh-Speed Data 
installation - (Ref. Item 5 2.2 of Proposal me 
7035248R03) 
xt Convex (ca-band) Mgh.Speed Data Sr-tern Instaltsban 
Ca-Ostrom kyr' instal this latest swum of high-speed 
firoadeand aata SyStetn. 
Ore (I) Modem Manager (MCOMNI) will be installed in Me 
aft baggage compartment Mance. cabinet. If Sat TV a 
installed, the exating cabnet will be modged and reused 
unless the cost exceeds the new canon instalaten. 
AS the overall manager for the system, the MOCNAN IS 
responsible for providing the user interfaces to the 
aircraft/Passeurn 
One (1)Aerefgutlai Personalty Module (AFM) wit be 
loaned in Me baggage comparonent eritirent cabinet and 
hems the configuration data For he system 
One (1) Ka-bend IkorrA Nehmrk Data Unt (KANOU) will be 
installed In the boiler room. The Keirei receives 
commands from tie HOOMPI Trough an Ethernet Interface 
to merging the antennall(REU and reports status oar 
this Ethernet interface 
One (I) sa.band Frequency Unt (KRIV) will be neater:1n 
the prnornty of me MIA assembly on toe of the tal 
empennage. 
The KRA) contains a Nod-Goan Gornerter (BOC) to 
convert the received Ka-band frequencies to IF fretruendeS 
and also is made up of a rods-up Comae. (WC) to 
convert the If frecoenoes to Ka-band frequencies. A High 
poner *molter (HPA) :sways me send strength for 
trans:visual by the antema. 
One (1) Tail Mounted Antema (TIM) wil be mounted on 
Reeoludon 
Pertained. Rap Rote Inspection pox to paint per 6550 AMM 27-50-00 Rev. March 31/17. 
See terns 8.23 6. 8.24 tor gasames 
Ben Ridgdll GAC MRB 01680 
12115i017 6:2803AM 
Gulfstream Proprietary Information 
hoc 12 a /9 
EFTA00796574
Sivu 13 / 29
Work Order: 
SC521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: All 
Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) 
Assoc 
Status 
Disaapanet 
Resolution 
top of the tail arpennage underneath the radcme. 
The arterna system is to amore and establsh 
communications wth SatellteS In WOWS atitS t0 enable 
beyond lintel-
richt orimusicatan between Strome, ground foal, end 
gaud transportable terminals. 
The Radome yin be renXrced and replaced by a new Ka-
band capable radorne. 
Certification: The Jet Cana (Ka-bard) High-Speed Data 
System along with the Sakern Direct Router wit be 
Installed ea Waster STC: meted. 
of STC, 
4th Quarter 2017. 
••• SEE AP9f-NDIX ••• 
15.1 .1 
In 
miores &retro) tape Avionics 
Progress 
15.1.2 
In 
latch Engr Later MOM= 
Progress 
15.1 .3 
In 
AV1 Systems Test Lagar Cn)y 
Progress 
15.1.4 
In 
MI /Electrical Labor Only 
Progress 
15.1 .5 
In 
Mei Sheet Med La00r OM/ 
Progress 
15.1.6 
In 
INT Swoon (RSA) Labor Olt 
Progress 
15.1 .7 
In 
SC MaIntenante/Hargar / Primary Codes / Touch Labor Only 
Progress 
15.1.8 
Open 
SC Pant Labor Cily 
15.1 .9 
In 
Inspection La00r Ccry 
Progress 
15.1.10 
Open 
Weight and Bake= Labor Only 
15.2 
Venting 
COMPLY WITH DRAWING CPE303000090 REV. B (KA-
400rOulli 
P:0) 
0.1 
15.3 
Open 
Comply with GfX303001004-501 Rev B 
15.7.1 
Completed Removed existing antenna structure bracket parts 
GC544030069-13, • It • 15, and -16 at P15993.60, 
renewed weight is .45 lbs , one 115901152050-001 and 
-002 .25 lbs each, one each 1159GS52014-067, 068 end 
059 removed weight is .10 lbs end, one 11594352014-059 
remxrred weght is .05 lbs per 01YGe GPX303001084-S01 
Rev F (kA BAND - GSSO INSTALL) 
15.3.2 
Completed Vented parts from stock; GPM304001379-301 Tray Saw, 
CP4468001411.301 GAS Fan Duct Any. 
GPM304001379.101, CP14304001408-101. 
GPM30400t409.101, GPH304001407-101, 
GPM304001380-301, GM904001381.331, 
GPM304001383.301, CP14304001382-301. 
GPM304001405•101, CP14304001405-101 Brackets. LOCate0 
and driled noted parts at Vat Stab PS. 1033.1 Eq. 0.0 per 
GPX3030010134-501 Rev. 
tog TO INSTALL) 
15.3 .3 
Open 
Installed GP/4304001379-301 Tray 065Y, 
GPM468001411-301 Guided Fen Dust Any, 
GM4304001379.101, GPH304001408-101, 
GPM304001409.101, CP14304001407-101. 
GM43D4001380.301, CP14304001381-301. 
G44304001383-301, GPH304001382-301, tea 
GPM3D4001405.101, CP14304001359-101 BratketS. MI work 
performed per GPX303001084-501 Rev. F 
15.3.4 
Completed Request Engineering Disposition: On the 
Engneering Dspositen: 
GPX303001084-501 &airing, malty Flog Noe 7 as diens. 
The mu:steel Mange to flag note 7 are acceptabe to eryneang and are a Myer change. 
Rep 2 mould reed: QOM Pltell and roll measurements In 
the nose landing gear bay using a maolevet on production 
installed levelng brackets. Set pitch of antenna tray to 
MREP7356 
Jason Grardban 
-1.00 degrees withn +1-.25 degree Fran readings taken 
from production installed leveling brackets. 
15.4 
Completed Comply WIN CP04160001469.301 Rev.--. 
Cabinet bought Iron, stock. Reference step 15.4 a1 
15.5 
Waiting 
Carla with GPX4680001547-301Rev.A. (Mery rent Amy.-
Complied with GPX4680001547-301Rev.A. (Pcnurrent Assy.- EttggageCabnet APH, MCOMAN G450/ 6550) See 
aPProval 
a.) 
Ettggage Cabnet APf4, MCOSVUI - 0450 / G550) 
steps tam for work pertained. 
15.5.1 
Open 
VOIDS" Ref Step 15.18 For seek Performed. 
15.6 
Waiting 
Comely with CPX468031549-501Rev.B (KANDU instl.) 
Complied with GPX468001549-501Rev.B (URDU irritt.) See steps below for work adorned. 
Imp 
15.6.1 
Completed Yenned parts from stock. Located, and dnlled 
GPM30400t349.30l Hountrg Plate Assembly, (1) 
GPM304001351-301Kancki attadaent angle assembly and 
(1) GPM304001351 KarOu attachment ange assembly to 
the areas at FS 890--905 VA 115. 
--OK TO INSTALL--
15.6.2 
Completed Installed (1)GPM304001349-301 Moulting Plate Assembly, 
(1) GPM304001351-301 Kandu attachment angle assembly. 
and (I) GP/4304001351 taros attachment angle to the 
12152017 62110AM 
Cul/stream Proprietary Information 
Pap< O,42V 
EFTA00796575
Sivu 14 / 29
Work Order: 
5O521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: AP 
Yellow =  Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or same Friday on Mondays) 
ASSOC 
SIMMS I 
 
Resolution 
IS.? 
Ye/slang 
Wormed 
(L) 
15.8 
WAND 
Wormed 
(1) 
15.9 
WAND 
Wormed 
(L) 
15.10 
15.11 
MOM 
40(04 
(L) 
Waibng 
aPPrOyal 
(L) 
15.12 
Ye/slang 
Wormed 
(L) 
15.13 
Waltirg 
Wormed 
(L) 
15.14 
Waltirg 
Wormed 
(L) 
15.14.1 
15.14.2 
COmOleted 
GPM 
15.15 
Waiang 
Wormed 
(L) 
15.16 
WAND 
Wormed 
(L) 
15.17 
Waltirg 
Wormed 
(L) 
15.18 
15.18.1 
15.18.2 
Waltirg 
aL0,04 
(L) 
Waibng 
Insp 
GPM 
15.19 
Waibng 
aPPrOyal 
(1) 
16 
KA BAND HARNESS PAIIIIICATION 
16.1 
In 
Progress 
16.2 
in 
Pr (Kir., 
17 
ASC 085A XM Weather Installation - (Ref. Item 8 2.3 
of PrOpOSal IDs 7038248 R02) 
17.1 
Discusser/ 
aircraft at FS 890-905 WL 115 rang Bkieprot sellout 
ha-Orme. 
Al hodi performed in accordancexiM Map 
GPX468001549-501 Rev B 
COCTOV ?AIR GPX468031557-501 Rev B ( BAGGAGE 
CABINET - APM, MODMM INSTL GSSO) 
COmptv with GP% 303001139-501 Rev - (RadOrne 
COMPLY WITH DRAWING GPE3030C0393 REV. A (KA-BANO 
TAIL WIRE HARNESS) 
COMPLY WITH DRAWING GPE303000092 REVA (KA-BAND 
BAGGAGE WIRE HARNESS) 
COMPLY WITH DRAWING GPE303000091 REVA (KA-BAND 
WIRE ROUTING) 
COMPLY WITH DRAWING CEE370C00013 REV.— (CCCIG'IT 
SWITCH PANEL MOO KA.BAND) 
COMPLY WITH DRAWING CEE394C00014 REV. A (AUX C.B. 
PANEL MOD) 
COMPLY WITH DRAWING GPE370300026 REV. A (COCKPIT 
SWITCH PANEL MOD. SDK) 
RenXwed obsencees seat Ini; 11595C7501•1 St4:201-1425. 
from aircraft tor avionics Install per 6550 ARAM 25-11-02 
Rev.31/17. 
Reinstall observers seat Ftl: 1159SCFS01-1 SN: 281-1425, 
after avionics install Is compacted per 6550 ARAM 25-11-02 
Rev.Mar 31/17. 
COMPLY WITH DRAWING GPE429000032 REV.F (SCR) 
COMPLY WITH DRAWING CEE4290)050 REV. A (CABIN LAN 
ROUTER MCC) 
COMPLY WITH DRAWING GPE429000037 REV. A (SCR 
WIRE ROOTING) 
COMPLY WITH CE5430X063 Rev ( 415C MODS- KA BAND 
INSTL) 
Vented locations and petted (2)a/451836-3 Inserts fa 
644806002351.101 Ao3le, (2)7143)836-3 Inserts ra 
644805001267.101 Ao3le, (6)7143)836-3 Inserts ra 
GPM004001496-101 and GPM004001492.101 angles. (2) 
KAS1836-3 Inserts fa CE444290002-103 Maranon= Panel 
Asw, (2) NA51836-3 515015 for CE444290002.101 Relay 
Rail, aid (4) NAS1836-3 1R5015 for 1233-F-2191-10 SattOm 
direct Router. All work performed per CES43030053 Rev -. 
Located and rotated (13) CB4019G3N7SPOITe Down Any 
IO Cabinet for electrical wring installation. All work done per 
*awing CE54303C053 Rev •. 
COMPLY WITH DRAWING CES1 4290267 Rev -. CABIN LAN 
(1400) 
COMPLY WITH GPE303000093 
COMPLY WITH GPE30300e097 
In 
Progress 
ASC 065A XM Weather Installation 
This Service Change instals an antenna, receher, too (2) 
data ports and assodated wing fa the *1 satelite 
weather SyStem. 
ether a tore or an aft instatation may be selected based on 
aircraft cooteurabon. 
AMYL Mat are Provisioned for AM Installation may recmire 
an °mimeos review 10 compete toe 'rotation. 
Pnwhiccis may rod** wring, &razor*, recover, data ports 
or any combination of these components and are typically 
installed poring competition. 
PrereRtigteS: 
ASC 908 - PkneVIew Mager Operating Software System 
SORWare Upitite (Cart Fox) 
Prior tot or at the time Ms A5C is ordered, operators villi be 
reot'red to semi., a configuration report Or toe 
Complied with GPX468001557-501 Rev B ( BArtrars CABINET APM, MCOMAN INSTL - GSSO) 
Ref Step 15.18 for work perfcemed. 
12'15,7017 6:21:01AM 
Gel/stream Proprietary Information 
Pay la of 29 
EFTA00796576
Sivu 15 / 29
Work Order: 
SC521661 AC: 5173 STM: Charks Thomas SCC: Julian Brown Squawkn au 
Yellow = Newly Added Items Green = Changed Rems (Ready for inspection or completed) from previous day (or since Friday on Mondays) 
Anor 
Sat% I 
Dbwepanw
17.2 
Waiting 
aPeroved 
(l) 
17.3 
ridt.% 
approval 
(L) 
17.4 
riattlna 
<dermed 
(L) 
17.5 
Waløn9 
aPProval 
(A) 
17.5.1 
Completed 
17.52 
Completed 
17.6 
Compkterl 
18.1 
Central Hantenarce Computer (CMC). 
The C% report an be stored cn me aircraft PC laptop 
men Wc-L/0mm 
suirnitted to Gulfweam at 
/Son rorte (3) to fem (5) dyrs le me OIC rapar! review 
and up to Mutrene (21) days (or the~ 
danen 
ODI1Ord Data disk. 
EttedMhe Trill SeMoa Mange a apoicable to alraalt 
Serial Msnbers 5001- ~ert 
Notes: 
Internt aocess toreform this installatIOn 15 ret inclocied 
me kil trace. 
Airport md.:jurati
 install ion Iscatai d the system 
ard avaitaomy 
ot
 spare yrinng "ly milan year hours, 
an/Juni Ce at (ESS reDueel end coud necesstate aootcnal 
eng neenng. 
ThisASC 5 a managed Frogn:in. Incorporatcn rust be 
COOMInated InrOu% CUNtrearn Artrast Scneouring at 
800.810-61As (4853) M 912-965-4178-
If not scheduled, armraft ~rene codd moane 
egrifpardy. 
II% Stryke Cnancre may only te nstateo at a atfstream 
Aerospace 
CMP GSSO 970051 ASC 85A »I ~Na Iratallaben 
COMPLY WITH DRAWING 11595557976 REV. A (»I 
MATER) 
COMPLY WITH DRAVANG 11595557977 REV. A ( XM 
MATER WIRE ROUTING) 
COMPLY WITH 11555547%5.15 REV.0 DIM ANTEN% 
INSTL.) 
Located and driled 11595847985 -19 dahle and tRo 
1159584795-25 nralatra Omtalen . Ce to «tall per 
11595541985 Rev C <kamre . Ret Red p9 18 C. 
InstaBed 11595847986 -19 doubler and Mo 
1159584790525 notpote datters per 11595847985 Rev 
C bana% . Ret RM prj IB C. 
CMP 6550 316705 XM ~Mer Antenna - Renoval 
Installaticn 
■ 
Ase 
912 and ASC 123 Pbnerfew MOS Upgrede -
(Ref. Item 8 Le of Proppsal ID* 7038248 R02) 
In 
Pregress 
18.2 
ConaSeterl 
18.3 
Completed 
ASC 9:2 ned ASC 123 Plsr.new MOS 
ASC 912: 
ibis Senke Mange (ASC 912) InStall5 tis maneYen master 
oDataene System (m05) software Mella Part (Omner 
(1%) MM7031235-024. 
AMC 123: 
na Service Range (45C 123) bads a combinaton of new 
ant ending software basedon <urent alioart 
configuratian. 
Prerepietep 
Sutene an APM Seteres 8 %anes lotto 
ASC 910 . eDneVien, MOS Software Update or later; er
ved-vinn equivdent is Ne rnnmum cert levd required. 
Pnce to, er at the urne ms A% a ceOrred, apsatars vrii be 
tepured to suneD a eorth9aratson report of the 
Centra Maintenante Computer (CMC). 
The CMC repal em be stored on me drent PC leptcp 
Nen electrencal sulanutted to Gulfstream at 
Operators utaana CuRem ETertrOniC CneedISt (Ea) mist 
aen new %ethvert. Pnet to, or at the time tNsASC 
Nanna. satsvare may ce ordered from em~ 
EO. 
page on vnGulfstreamcorn 
tonearret Requirements: MC 912 and ASC 123 we 
complkd niro in ccmunction. 
eneavity: rna Service Cnamje K apoicable to antatt 
&dal Nulte!, 5001 - 5549. ThiS. Of a såmoe denge, MI 
be 
installed clunng insal phase ~ur/letemg on arma Send 
momsas 5550 and nesecuent 
Notes: 
Aka% that do not med the prerecubite minimum levd (or 
mcdificatian may utast dumma 11595857083 to 
n»at 
te 
bets
regulrerne
 Of MC 107 and ASC 910. TI% 
nen) near 
ona
eused coocumently 
vil
MC 123 and 
MC 9:2. 
Abc:art te m  drøning 11595857010 to nettene 
pereouste namn" reaultements or ASC 107 ard MC 
910 
Support et a managed ecegeam condisted by Product 
Support Program Management (PSPM). 
CMP 6550 979120ASC 912 PuneVietr Mager Coeraeng 
System Scarrere Update 
CMP 6550 9712304SC 123 Pta-idem AL‘erres 
Roodudon 
COMPUED WITH 11595547985.15 REV.0 (X4 ANTENNA D1511..) SEE STIPS BELOW FOR WORK PERFORMED. 
REFERENCE CMP 316705 (STEP 17.6) 
COMPUED WITH CMP (550 316706101 Yromner Antenn Removal i Instalation 
COMPUED %VIN CMP 6550 979120 A5C 912 mannnew Master °matine System Software Utelate 
COMPUED Orrfil CMP 6550 971230 ASC 123 PlerieNew Arenes Enhancement 
1245..2017 6:2153AM 
Gulfslreaen Propriet/sy Infnation 
Pace IS 
EFTA00796577
Sivu 16 / 29
Work Order: 
5C521661 AC: 5173 STM: Chart Thomas SCC: Julian Brown Squawks•. MI 
Yellow = Newly Added Items. Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) 
ASSOC 
Stades 
18.4 
Completed 
18.5 
Completed 
18.6 
Completed 
18.7 
Can: Pete] 
18.8 
Completed 
18.9 
COmp/MCI 
18.10 
Competed 
18.11 
Carpeted 
18.12 
Completed 
18.13 
Completed 
If 
19.1 
Open 
Discrepant/ 
Enhancemert 
OW G550 319010 lbneywel Ptaneview Operational 
Software master OPerardr9 System Top Level System 
(VMite Disk) 
•••VOID• • • CMP GSSO 319015 Honeywell Planeview, 
Conigiratix (Piraaft Opbons) Software Top Level 
System (Yellow Disk) 
CMP G550 319017 Honeovel Planeview, Aircraft Optons 
Data Software Weds, (White Disk) 
04P 6550 319020 Gulfarearn, Electronic Dedlist Seetware 
(Pa* Disk) 
CMP 6550 319025 Gulfstrearn. Setang / Rigging Software 
(Grey Cask) 
OAP 6.550 319040 GUINtrearn, CommunIcadanS 
Management rtmcmn Amine modinable Informatics,  (AMI) 
Software (Orange Disk) 
OW 0550 319044 GuIrStream, Programmed° CAS 
Messages Software (Turquoise Disk) 
01P G550 319030 Gulfstrearn. Central Maintenance 
Computer Loadable Diagnostic Irionnation Software (Black 
Disk) 
CMP 6550 319110 ATC Data Base du Vpdate 
Comdy vain GvSP.GE.R.7 32 RTS Chtdwix Prccedcre 
Rowena Woodwork • (Rd. Want A Li of Proposal 
20* 7039407 R00) 
Reveneer WcCdAt.S. 
The exl≤trol'ovrieer COMM COT 00001,3 MI be removed 
km the arcraft and stowed of all veneer surfaces, 
Katmai caps. and nosng. 
Al subsbate mill De Cleaned and pepped for aPPliCanan o 
new selected ‘treer (III 170718.2 QM Slyer Brai)wth 
correspordng AsOnccd caps and nadng. 
Modficaticns a repars to any substrate material or 
%wawa, hard/are will De evaluated and addressed on a 
time and material bass. 
Al the exatng Latches mill be deaned and retained, New 
hrdware, d requested, MI be addressed on a tine and 
meteriaN basis. 
New Customer Selected Veneer MITI be aDDled to the 
existing substrates. 
The new veneer will be finished with Gulfstream standard 
141411 Clear coat finish and poisbed to a Predetermined 
luster. 
Al applicable eternal surfaces Mill be cleaned and retaned 
In edging COniltien Paining a recoQem) fie the internal 
SWIMS yin be addressed on a tine and materials basis. 
Inlays of any type uach as wood, metal• car gone inlays are 
not included in this proposal. Exlgrg relays MI be 
evaluated on a case by case basis and addressed onetime 
and materids bass. 
Burn certificate° a indebted upon the costing substrates 
meeting al the FM flammablity requirements. Gulfstream is 
not responsb* for any existing materials meeting pars 
reotoenents. 
The recovered dons, prods, and cabinetry will be 
reassembled and mutts it aircraft. MI adjustmentsMI be 
made to ensure Cones Mt aid function. 
ECNIPMent relOCa000 k net Part Of ttiS proposal and wit be 
addressed metro and inseends base. 
In SEE APPENDIX FOR ADDITIONAL INFO ••' 
19.1.1 
In 
AI fEleCtilcal La0or OW 
Progress 
19.12 
Open 
INT Sheet metal Labor Only 
19.13 
In 
Wood Labor Only (270 ) 
Progress 
Deducted 270 ban from the original 1897 hours for vendor 
supplied lobo- (SAPS) 
19.1.4 
Open 
INT Finish and Paint tabor Onrir 
Total Mors 405 
OutSde tabs fa 11/27 W 12/6 
197 hrs 
RellOkidOn 
COMPLIED WITH 04P GSM 319010 Ilawywell Maneview Op:rat/nal Software Master Operating System -Top Level 
Waal White Disk) 
Pfl OFF: 037031236-00323 
Pfl ON: 837031236-0032S 
SN OFF: 35582318 
SN ON: 356269E2 
•••VOID•••ENTERED IN ERROR SEE ITEM 18.6 
COMPLIED WITH 04P G550 3190171bnewiell Dian 
NI OFF: DM60002648-50047 
Pti ON: DV 60002648.50078 
SN OFF: 5173 
Sit ON: 5173 
COMPLIED WITH OW 6550 319020 GullStreany Electronic Crieddist Software (Node Disk) 
COMPLIED WITH 04P G550 319025 Gulfstrearn, Seftirg / Piecing Software (Grey Cask) 
COMPLIED WITH CMP G550 319040 Gullstrearry Communications Management Flatten Aldine modeia0e Information 
(Awl) Software (Orange Disk) 
Aram Options Data Software - Reda (MX DSc) 
Pf4 OFF: 69001791.503 
PN ON: 69001791.505 
Sri OFF: GM 20AUG2013 
SN ON: CDC O41UL2017 
COMPLIED WITH CMP 6550 319044 GultMedrn, Progammade CAS messages Scrtwart (TURIU0Se Disk) 
COMPLIED WITI CMP G550 319030 Gulfstream, Central Mart/nonce Computer Lendable Diagnostic Information 
Software (81mk Disk) 
PM OFF: GY_911 00323 01_022714 
Pti ON: GY_912_003:5 03_052317 
SN OFF: 5173 
SN ON: 5173 
COMPLIED WITH CMP G550 319110 ATC Data Base Dec • Update 
Complied with GYSP-GSR-7132 RTS Checker/ Precedire 
Reference papa'copy (rdee 9A) line signs for Mork Performed. 
IIIISROI7 6:21.01AM 
Gulfdreom Proprietary Infonnetlan 
Pate 16 0'29 
EFTA00796578
Sivu 17 / 29
Work Order: 
5C521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: All 
Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) 
Assoc 
Status 
-Cl
Resolution 
Outside Labor for 12/4 to 12/10 
208 In 
19.1.S 
In 
'HT Sapped (R8A) Labs. Cnly 
Progress 
19.1.6 
In 
Inspection Labor Orgy 
Progress 
19.1.7 
Open 
ElarornabiltT / Muted, Labor Orly 
19.1.8 
In 
Wood ShOP Labor to Stelp Fuser., Veneer. 
Progress 
19.1.8.1 
In 
Strip Veneer - Rll and LH 680 &Alma& and Door. 
Complied with Labor to striprenew kern the RH and LH 680 bulkheads and doze. 
Progress 
19.1.8.2 
In 
St® Veneer • AFT LAY WOW and SOME 
Progress 
19.1.8.3 
In 
Sins Yenta - AFT Lay Varety 
Progress 
19.1 8.4 
In 
StrO Veneer • AFT Ul C1OSet. 
Progress 
19.18.5 
In 
Strip Veneer - Art RH acad. 
Progress 
19.1.8.6 
In 
WO Veneer • AFT LH Gal/W. 
Progress 
19.1.8.7 
In 
Sire Veneer - AFT RH Galky Annex. 
Progress 
19.1.8.8 
In 
Sin Veneer - 4 Dian End Cabinets. 
Progress 
19.1 8.9 
In 
Strip Veneer • Cabin LOOK. 
Progress 
19.1.8.10 
Open 
Sin Veneer - Console Tables. 
19.1.8.11 
Open 
Sin Veneer - FWD Fodcet Door. 
19.1 8.12 
In 
Stro Veneer • FWD 814 and LH Cabin Bulkheads. 
Progress 
19.1.8.13 
Open 
Sin Veneer - PSU Hardrals. 
19.1.8.14 
Open 
Sin Veneer - FWD Crew Refresh Cabinet. 
19.1 8.15 
Open 
Aro Veneer • FWD RH Law. 
19.1.8.16 
Open 
Sire Veneer - REIM and LEER paneb. 
19.1.8.17 
In 
Sire Veneer - ACOSX Door. 
Progress 
19.1 8.18 
In 
Stro Veneer • EnIn Panels (2) 
Progress 
19.1.8.19 
In 
Strip Veneer - AFT LAV Door. 
Progress 
19.1.8.20 
Open 
Stro Veneer • FWD Lae Door. 
19.1.8.21 
In 
Strip Veneer - !lawns Rads. 
Progress 
19.1 .9 
Open 
W000 Shop Labor to Reveneer Minas. 
19.1.9.1 
In 
Law to Veneer LH and RH 680 Bulkheads and Door. 
Progress 
19.1 9.2 
In 
Law t0 Vereer 
LAV Niche and Synod. 
Progress 
19.1.9.3 
In 
Lace to Veneer -OFT Lay Vanity. 
Progimss 
19.1.9.4 
In 
Labor to Veneer AFT LH Closet 
Progress 
19.1.9.5 
In 
Lady to Veneer -AFT RH Closet. 
Progren 
19.1.9.6 
In 
Labor to Veneer -OFT LH Gate,. 
Progress 
19.1.9.7 
In 
Lace to Veneer -OFT RH Galley Anna. 
Progress 
19.1.9.8 
In 
Labor to Veneer 4 Coen End Ca0nets. 
Progress 
19.1.9.9 
In 
Lace to Veneer Cabn Ledges. 
Progress 
19.1 9.10 
In 
LOW tO Veneer - FWD Pocket 000r. 
Progress 
19.1.9.11 
Open 
Labor to Veneer FWD UI and RH Bdkheads. 
19.1.9.12 
Open 
Labor to Veneer PSU Hand Rads 
19.1.9.13 
Open 
Labor to Veneer FWD Crew Regresh °dna 
19.1.9.14 
Open 
Leto- to Veneer FWD RH Lay. 
19.1.9.15 
Open 
Leto- to Veneer LEER and liter Panels. 
19.1 9.16 
Open 
Labe/ tO Veneer - ACOuStle 000r1, 
19.1.9.17 
Open 
Labor to Veneer - Entry &Ahead, (2) 
12IS.2017 42lb, AM 
Gulfstream Proprietary Information 
Pape 17012'0 
EFTA00796579
Sivu 18 / 29
Work Order: 
5C521661 AC: 5173 STPI: Charles Thomas SCC: Julian Brown Squawks: Ali 
Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) 
Assoc 
Status
Discrepancy 
Resolution 
19.1.9.18 
19.1.9.19 
19.1.9.20 
19.1.9.21 
19.1.10 
19.1.10.1 
19.1.10.2 
19.1.10.3 
19.1.10.4 
19.1.10.5 
19.1.10.6 
19.1.10.7 
19.1.10.8 
19.1.10.9 
19.1.10.10 
19.1.10.11 
19.1.10.12 
19.1.10.13 
19.1.10.14 
19.1.10.15 
19.1.10.16 
19.1.10.17 
19.1.10.18 
19.1.11 
19.2 
19.3 
Open 
Open 
Open 
Open 
Open 
Open 
Open 
Open 
Open 
Open 
Onen 
Open 
Open 
Open 
Open 
Open 
Open 
Open 
Open 
Open 
Open 
Open 
Open 
Waibng 
Into 
WAN 
aPprowd 
(1) 
Walen9 
aPprowd 
(1) 
Labe- to Veneer AEI' Lav Door. 
Labor to Veneer FWD Lav Door. 
Labor to Veneer Cceisole Tables. 
Lass tO Veneer Madeline RaCkS-
Wocd Shop Labor to Assemble Labatt. 
Labe- to Assemble Ul ard RH 680 Bulkheads and Dear. 
Labor to assent* 
tav tiple and Wroud 
Labor to Assemble AF7 Lav Vanity. 
Labor to Assemble AF7 W Upset 
Labor to assent» - AFT PH 009it. 
Labor to assent» - AFT UI Gatey. 
Late- to Assemble AF7 AH Galey Amex. 
Late- to Assemble 4 Divan End Cabinets. 
WØ tO Anemia* - Can Ledges. 
WØ tO Anemia* - COnSede tatieS. 
Labor to Assemble FWD Podiet Door. 
Lat t0 Assemble - FWD UI and PH Cahn Bulkheads. 
Wt tO Assemble - FWD Crew Region Cabinet 
Labe- to Assemble - FWD PH Lev. 
Labe- to Assemble - Leet and Reef Panels. 
Wt tO Anent,* ACOuSIJC DOGS. 
Wt te, Assemble - AFT t.av Doer. 
Labor to Assemble - FWD Lav Door. 
•••Entered in Ester 
FlanYnablIty Data. 
arid Rewneer LH and RH 450 Bulkheads and Door. 
Sao and Revmeer AFT tav NChe and Shroud. 
19.4 
19.5 
WMOng 
a—
(L) 
Waibng 
a—
g.) 
WO and Revmeer arr tav Vanity. 
Stnp ard Rovmoer AFT W Omet 
19.6 
19.7 
19.8 
Waibng 
aPProval 
D.) 
Waltn9 
aPProval 
(1) 
Waltn9 
aPProval 
(L) 
Strip ard Kameer AFT RH Closet 
Sao and Revmeer AFT tu Galley Assy. 
Stao at Revmeer AFT RH Gate, Amex ASSY. 
19.9 
19.10 
Wale% 
a—
(1) 
Waibng 
awaws 
(l) 
WO and Re«neer 4 DWan End Cabinets. 
Strip and Ramer Cabe, Ledges. 
19.11 
19.12 
19.13 
Waibng 
aPProwd 
(l.) 
Water., 
aPProval 
(L) 
Water., 
aPProval 
(L) 
Stnp and Ramer Pocket Door. 
StM and Re•eneer FWD UI and WI Buldvarls. 
WO and Reoeneer PSJ Hanealls. 
19.14 
19.15 
waiting 
a—
(L) 
Waibng 
a—
(L) 
Stro and Re«neer RIM Clew Refresh Cabinet 
Strip ard Rmeneer FWD RH Lav Assy. 
19.16 
19.17 
19.18 
Waibng 
aPProval 
(l.) 
Walen9 
aPProwd 
(1) 
Walen9 
Sim and Rmawer LEER and PEER Panels. 
SD° and Re•eneer acoustic Doors. 
SD° and Re•eneer Entry %kneads 
12, M2017 6;21:03 AM 
Gulfstream Proprietary Information 
l'am Igor 
EFTA00796580
Sivu 19 / 29
Work Order: 
50521661 AC: 5173 SIN: Chart Thomas SCC: Julian Broym Squat: Ali 
yellow = Newly Allied Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) 
Nam I SIAM 
19.19 
19.20 
annoyer 
(L) 
alt 
g 
agOroval 
Waibng 
a00ronal 
(1) 
19.21 
Waibng 
a00ronal 
0-) 
19.22 
Wailing 
etyma 
(U 
19.23 
Waiting 
ran 
(-) 
20 
20.1 
OPen 
20.1.1 
20.12 
20.1.3 
20.1.4 
Open 
Open 
Open 
Open 
20.1.5 
Open 
20.1.6 
Open 
20.1.7 
Open 
20.1)3 
Open 
20.1.9 
Open 
20.1.10 
Open 
20.1.11 
Open 
20.1.12 
Open 
20.1.13 
Open 
20.1.19 
Open 
20.1.15 
open 
20.1.16 
Open 
20.1.17 
Open 
20.1.19 
Open 
20.1.19 
Open 
20.1.20 
open 
20.121 
Open 
Disalpanor 
Stop and ReKneer 3 Console Tables 
Strp and Renmeer AFT lay Door. 
Dap and Reasneer FWD Lay Door. 
Srop and Reasneer Magaare racks 
Sett one rev wth closet, credenza and Mt ow, rehash 
cabinet to SAPS fa strip and revenea. Pictures taken for 
documentation. 
Re94ba0ae Change 
a 
COrrfifir with registratiOn Change as calmed In RECCT*115 
Rev. 12. 
Registration charge to 14212X. 
Customer requests that the Guirstream ODA issue a 
replacement standard atm.:ahem= certifieate Are to 
registrathin crave. Provide t0 the ODA the f011FrAng 
items: 
A. A cepf of the Ai:Mader cover Meet with current haws 
and IP-dings. 
8. Standard AhvartinessCertnate, FM Form 8100-2. 
C. Ceroncate of MOM Regstraticn, AC Fern 80563. 
Requre a written onprol statement signed by the 
registered awe or certficate °Fedor to requat a 
redaoement afrnortniness certMcate. The request Shall 
include the resist:awn number. Serial nunDer, make and 
model d the aircraft as well as the reason for the request. 
Renew the arcreA reostes and nspect the aircraft to 
ensure me request Is Justine, and the await is eligible for 
me cerdicanon requested. Records review consists 
ventmauan that there are r  preen inareenance due aCbCetS 
or amorthmens drectives.Arcraft meatus coasts of a 
data date and registration marking marrination, wen a 
visual rose./ or me aircraft for 01,4005 COntlitens impacting 
aircraft safety. 
Verily current arro-aft re0stra00n, reference 14 CFR 07: 
Nara copy Regabation AC fpm 8050.3 for new registration 
rumba or Assignment of Spxial Registration Nuirbs AC 
tom 8050-64 drid heed airy of old Aerobia° AC ram 
8050.3 8050.3 or Deaier Rept:eaten AC Form 8050-6. 
leafy new registration number is treatedon the await. 
Rd: 14CFR 45. 23, 45.25, 45.29 & 45.33. 
Verify aircraft ID Mee instdlabcn. Rd: 19 CFR Part 45. 
FM form 81C0-2 Mote for new regstranon number by 
arfsvean ODA. 
If the winner defers Gulfstream COA issuance of a 
replacement aims:Rhine= certificate, a Cants- mu/ink will 
be Signed as deemed by the Cugemar. Rrel : 14 CFR 
91.203 (a) (1)1. 
Re-strap/ Re-program transponders to new registration. 
(Transprorelers with Mode 5) 
Reibipfite Program SELCAL CO new code F Own011117 
changes. 
Cornmenn SATCOM for new moat., ce Re•Strap SDU 
foe new registration number Change. 
Reconnect° Magnastar, Nrcell. & Kir 
systems. 
Centime MIS. Now tnstdlatices or regstrabon nunba 
change. Re-strop via Laptop. 
Install new regstraton minter daardS in cockpit. 
Insoles' new) SEI.CAl. number in cockpit. 
Change logo on Amboy. f Catinview, if ownership changes. 
Re-strap or re-program ELT's (90614112)n aircraft (As 
rectired to new registration and I or county Cede). 
Reconfigwe highS 
Data Units or 8Mi 
Rearing-re Display Controlers Tail number f  SELCAL 
Vainly Paper regStraDOn of ELT's (406191-12) ( If Instated In 
life molt). 
Rearing-re the Erhanced Flight Identifialson Code to the 
current rept:Paten 
20.122 
Open 
Wain a copy of me feart Certricate of aawarthiness. 
Foreign ArnatIlifteSS Certificates, all Foreign ROSIISbatkin 
Documents and archive with the walcader. 
ReedudOn 
17/110017 6:11:01AM 
Cul/stream Proprietary Informalion 
Palo ION 29 
EFTA00796581
Sivu 20 / 29
Work Order: 
SC521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: All 
Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) 
ASSOC 
Shuts 
Discrepancy 
Resolution 
21 
12 Month OSP Tasks (Exhibit]) - (Rat Stan C 1.1 of 
Proponent.* 7039702 ROO) 
21.1 
waiting 
aPProyal 
AcconAIM 12 Month CMP TaSkS (Exhibit 1) 
Notes: 
(L) 
Cerrection of decrepancies a rot included in the quoted 
oce. 
matenais/ Outside Services will be tilled as rectired. 
21.2 
Open 
CMP 6550 237004 COMM Voice Reterder Operational 
21.3 
Open 
Test 
CMP 6550 240121 Emergency Battery Power System (Left) • 
OPerational Test 
21.4 
Open 
CMP G550 240122 Emergency Battery Power System (Right) 
- Operabond Test 
21.5 
Open 
04P 6550 240123 Emergency Battery Power System 
(Forward). OPerational Test 
21.6 
Open 
CMP G550 240124 Emergency Battery Power System (4/1)-
OperatioeS Test 
21.7 
Convicted 04P 6550 243011 L Man Battery - CapacityOw* 
COMPLIED WITH CMP G550 243011 L Main Battery • CapaOty Dyck 
21.8 
Completed 04P 6550 243012 R man SOAPY 00acRY Check 
COMPLIED WITH CMP G550 243012 R Main Battery • CapaOty Check 
21.9 
In 
CMP 6550 256043 Few Aid Kit (No. 1) - Details Inspection 
Progress 
21.10 
ComOkted 04P 6550 256071 flashlight (Ho. 1) - OpealionalOyck 
COMPLIED WITH 04P G550 256071 Fiashliga (No. I) - Operational Crreck 
21.11 
Completed CMP G550 256072 FtoshIght (No. 2) -Operational Test 
COMPLIED Willi 04P G5S0 256072 RasNight (No. 2) -Operational Test 
21.12 
Completed CMP G550 256073 RashIght (Ho. 3) -Operational Test 
COMPLIED WISH 04P 6550 256073 RasNight (No. 3) - Operatimal Test 
21.13 
Completed "'DELETE"' OW 6550 256161 mutual/at • Detailed 
Medical kit not installed on this aro* per ncombn drawing 60528000312 Rev 8. 
Inspection 
Customer Signature: 
Date: 
(Oaten:: signature on File) 
21.14 
Completed •••DELETE••• Ceelo GS50 256162 ftedeal itst lime Limited 
Medical kit not instdled on this aircraft per Iboe0br droving 60528000312 Rev B. 
Supplies- Discard 
Customer Signature: 
Date: 
(customer signature on File) 
21.15 
Open 
CMP 6550 256201 Life Vest(s) - Detailed Inspection 
21.16 
Completed CMP 6550 256202 Lire Raft(s) (No. I) - Detaled Inspection 
COMPLIED WITH CMP G550 256202 Lire Raft(s) (NO. 1)- Detailed Inspection 
21.17 
Completed CMP G550 256203 Lire Raft(s) (No. 2) - Deleted Inspection 
COMPLIED WITH CMP G550 256203 Lire Raft(s) (NO. 2)- Detailed Inspeaion 
21.18 
Completed CMP GSSO 256282 Perscrol Ikeethro Equipment (1b. 1) -
COMPLIED WTI CMP G5S0 256282 Personal Breathing Equipment (No. 1) - Detailed Inspection 
Details Inspection 
21.19 
Completed 04P 6550 256306 EnkeyawV Locates' TranstaRter • 
coetwoogi Test (FAR 91.207) 
COMPLIED WITH CMP G550 2563% Erna yaws, Locator Transmitter - Operational Test (FAR 91.207) 
21.20 
Completed CMP GSSO 262560 Trash Receptacle Enclosure (Mt 
COMPLIED WITH 04P G5S0 262560 Trash Receptacle Enclostre (Mt Lavatory). Detaied Inspection 
Lavatory) - Detailed Impaction 
21.21 
Completed 04P 6550 262561 TraSh Receptade Enclosure (Forward 
COMPLIED WITH CMP G550 262561 Train Reavtacie Enclosue (Forward Lavatory) Cleated Inspection 
Lavatory) Detailed IrepeCtiOn 
21.22 
Completed CMP GSSO 262562 Trash Receptacle Enclosure (Mt Galley 
COMPLIED WIT( CMP 6550 262562 Trash Receptacle Erobstre (Mt Gales, 1 Arrtex) - Detailed Inspection 
Annex) - Detailed Impection 
21.23 
Completed 04P G550 262583 TOM Receptade Fre Extinguisher 
COMPLIED WITH 04P G550 262583 Trash Receptacle Fire Extinguisher NOMM (Mt Lavatory) - Detailed Inspection 
Nozzles (Mt Lavatory) - Detailed Inspection 
21.24 
Completed CMP G550 262584 Trash Receptacle Fre Extinguisher 
COMPLIED WTI CMP G5S0 262584 Trash Receptacle Fire Extinguisher Nozzles (Ponverd Lavatory) - Details 
NOVI% (FOnsard Lavatory) - Detaled Inspection 
Inspection 
21.25 
Compieted 04P G550 262585 TraSh Receptacle Fre Extinguisher 
COMPLIED WITH 04P G550 262585 Trash Receptacle Fire Extinguisher NOMM (AR Galley / Annex) Detaled 
Nozzles (Aft Galley/ Annex) - Detailed Ireprction 
Inspect:3n 
21.26 
Completed CMP G550 262601 Portable Haim Are Extingusher 
COMPLIED WTI CMP 6550 262601 Portable Ibbn Fre Extinguisher (CoMpt) - Inspection 
(COMPIO • Inseecebn 
21.27 
Completed 04P 6550 262602 Ported° Haim Fire Extinguisher 
COMPLIED WITH 04P G550 262602 Portable Haion Fre Extinguisher (Cockpit) • Weight Check 
(Coduot) - Weight Check 
Scab: 566768 
Cal. Due: 04/18 
21.28 
corona 
04P 6550 262621 Portable Haien Fire Extinguisher (Nt 
COMPLIED \VIM 04P G550 262621 Portable Haion Fre Extinguisher (AR Ca0in) • Inspection 
Cabin) - Inspection 
21.29 
Completed 04P 6550 262622 Portable Haien Fire Extinguisher (Art 
COMPLIED 1VITH 04P G550 262622 Portable Haion Fre Extinguisher (AR Ca0in) • Weight Check 
Cabin) - Weir Check 
Seale: 566768 
Cat. Dom: 09/18 
21.30 
Completed 04P G550 262631 Portable Hakin Fire Extinguisher (Aq 
COMPLIED WITH 04P G550 262631 Portable Haim Fre Extinguisher (AR Lavatory) • Ir6pecbon 
Lovett(?) InefeCtIOD 
21.31 
Completed CMP G550 262632 Portable Halm Are Extingusher (Mt 
COMPLIED WIT( CMP 6550 262632 Portable Hobo Fre Extinguitlier (AR Lavatom) - Weight Check 
Lambe?) - We5Mt Deck 
Scale: 566768 
Cal. Due: 04/18 
21.32 
Completed CMP G550 312003 BAITER?, PILOT 000( 
COMPLIED WITH CMP G5S0 312003 BATTERY, PILOT CLOCK 
21.33 
Completed CMP G550 312004 BAITER?, COPILOT 000( 
COMPLIED WTI CMP G5S0 31200E BATTERY, COPILOT CLOCK 
12102011 6.71.0, AM 
Gulfstream Proprietary Information 
Puy Oo(20 
EFTA00796582